Laserfiche WebLink
<br />DRAFT <br /> <br />a part hereol; Grantee must extend its System upon request to provide service to <br />any Person or business, without charging such Person or business more than the <br />Standard Installation charges for the individual Subscriber's Drop, consistent with <br />the System Construction schedule set forth in the Franchise, including (but not <br />limited to) Exhibit A. <br /> <br />4.4.3 Within the Franchise Area, including any areas annexed after the Effective Dale <br />of this Franchise, except those areas located in the Franchise Area solidly shaded <br />in green, blue or orange in Exhibit B (which shall be served in accordance with <br />Section 4.4.2), the Grantee must extend its System upon requcst to provide <br />sel'Vice to any Person or business. without charging such Person or business more <br />than the Standard Installation charges tor the individual Subscriber's Drop, as <br />long as the Il1110wing conditions are satislied, unless the Grantee demonstrates to <br />the City's satisfaction that a waiver of this requirement is justified due to <br />extraordinaJY circumstances: <br /> <br />4.4.3.1 <br /> <br />4.4.3.2 <br /> <br />the new Subscriber requesting service is located 150 feet or less <br />from the termination of the Cable System; and <br /> <br />the area of the City in which the new Subscriber resides has a <br />density of at least thirty-live (35) dwelling units per mile of feeder <br />cable, excluding Drop footage, when aerial construction is required <br />lor an extension, and at least fifty (50) dwelling units per mile of <br />1Ceder cable. excluding Drop 100tage, whcn undcrground <br />construction is required tor an extension. All areas that reach the <br />applicable density requirement at any time during the Franchise <br />term shall be provided service upon reaching the minimum density. <br />The City, lor its part, shall facilitate the extension of service by <br />requiring developers and utility companies to provide the Grantee <br />with at least Iifleen (15) days advance notice of an available open <br />trench (or the placement of necessary cahle, hut in 110 event shall <br />the City have any liability for its lailure to require any Person to <br />provide notice, or for any developer's or utility company's failure <br />to provide advance notice hereunder. <br /> <br />4.4.4 In the event that the requirements set forth in subsection 4.4.3 are not met, <br />Persons requesting service can be required to bear the remainder of the total <br />construction costs on a pro rata basis. <br /> <br />4.4.4.1 <br /> <br />The "total construction costs" are defined as the Actual Cost to <br />construct the entire extension including electronics, pole make- <br />ready charges and labor, but not the cost of the house Drop. <br /> <br />25 <br /> <br />~() <br />