My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2007
>
2007-11-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2007 1:13:38 PM
Creation date
11/9/2007 1:12:23 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />be collected by a licensed solid waste handler in accordance with City ordinances. <br />Recycling will be encouraged and will also be collected as is typical in the city of <br />Centerville. Hazardous waste is not expected to be generated by the development. <br /> <br />b. Identify any toxic or hazardous materials to be used or present at the site and <br />identify measures to be used to prevent them from contaminating groundwater. If <br />the use of toxic or hazardous materials will lead to a regulated waste, discharge or <br />emission, discuss any alternatives considered to minimize or eliminate the waste, <br />discharge or emission. <br /> <br />During construction, equipment and vehicles utilizing gasoline, diesel fuel, antifreeze, <br />and oil will be used at the project site. Portable storage tanles of fuel may be temporarily <br />located at the site during construction. Fueling of vehicles and equipment will be <br />conducted away from sensitive areas. If an accidental release occurs, efforts will be <br />made to contain the release and the MPCA State Duty officer will be notified, as <br />required. <br /> <br />c. Indicate the number, location, size and use of any above or below ground tanks to <br />store petroleum products or other materials, except water. Describe any emergency <br />response containment plans. <br /> <br />As discussed above, portable storage tanks of fuel may be temporarily located at the site <br />during construction. Permanent above or below ground storage tanles will not be installed <br />as part of the proposed project. <br /> <br />21. Traffic <br /> <br />Parking spaces added see below. Existing spaces (if project involves expansion) <br />see below. Estimated total average daily traffic generated 3.530 trips. Estimated <br />maximum peak hour traffic generated (if known) and time of occurrence 171 pm <br />trips entering the redevelopment area. <br /> <br />Provide an estimate of the impact on traffic congestion on affected roads and <br />describe any traffic improvements necessary. If the project is within the Twin Cities <br />metropolitan area, discuss its impaet on the regional transportation system. <br /> <br />Parking <br />Cunently there are approximately 100 parking spaces in the downtown area. This <br />estimate includes approximately 50 spaces comprised of on street parking and small off <br />street parking lots as well as approximately 50 spaces for the Centerville Elementmy <br />School. The school itself is located north of and adjacent to the redevelopment area, but <br />its primary parking lot lies within the redevelopment area. <br /> <br />Per City Code Section 154.170, required parking for the proposed redevelopment consists <br />of748 spaces for the residential portion of the redevelopment (2 spaces/unit per City <br />minimum requirements) and 378 spaces for the retail portion of the redevelopment (6 <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.