Laserfiche WebLink
<br />30.0ther potential environmental impacts <br /> <br />If the project may cause any adverse environmental impacts not addressed by items <br />1 to 28, identify and discuss them here, along with any proposed mitigation. <br /> <br />Impacts in addition to those discussed previously in this EA Ware not anticipated. <br /> <br />31.Summary of issues <br /> <br />Do not complete this section if the EA W is being done for EIS scoping; instead, <br />address relevant issues in the draft Scoping Decision document, which must <br />accompany the EA W. List any impacts and issues identified above that may require <br />further investigation before the project is begun. Discuss any alternatives or <br />mitigative measures that have been or may be considered for these impacts and <br />issues, including those that have been or may be ordered as permit conditions. <br /> <br />The project proposer must acquire the previously mentioned permits and approvals prior <br />to proceeding with construction. Temporary and pem1anent erosion and sediment control <br />plans and a stormwater pollution prevention plan (SWPPP) must be prepared. <br /> <br />Issues that will require additional investigation include: <br /> <br />· The wetland identified within the redevelopment area must be delineated. The <br />delineation report will need to be submitted for review and approval to the Rice Creek <br />Watershed District (RCWD) as the Local Govemmental Unit (LGU) responsible for <br />administration of the Wetland Conservation Act (WCA). Any impacts proposed to <br /> <br />the \vetland \vill reqllire prior approval by the P,-C\^lD and l11itigation at a 2: 1 ratio <br /> <br />will be required prior to impacting the wetland. <br /> <br />· Demolition of existing structures to allow for redevelopment will generate waste <br />materials, some of which may be considered hazardous (such as asbestos containing <br />materials). Additional investigation will be needed to ensure that demolition of <br />buildings and disposal of materials/debris is conducted in an appropriate manner in <br />accordance with federal, state and local regulations. <br /> <br />26 <br />