My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-09-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:39:10 PM
Creation date
9/15/2005 10:51:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- - - - -- - - <br /> J <br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> BASE BID: <br />1 MOBILIZATION LS 1 10000.00 1 $10,000.00 <br />2 POND EXCAVATION CY 3000 10.15 2482 $25,192.30 <br />3 DITCH EXCAVATION LF 1150 6.60 1170 $7,722.00 <br />4 WOOD SKIMMER EA 1 760.00 1 $760.00 <br />5 REPAIR EX. WOOD SKIMMER EA 2 500.00 2 $1,000.00 <br />6 CLEAR AND GRUB LS 1 7000.00 1 $7,000.00 <br />7 4' DIA PRECAST MH, 7'-8' DEEP EA 1 3700.00 1 $3,700.00 <br />8 24" HDPE LF 90 45.00 90 $4,050.00 <br />9 24" HDPE FLARED END SECTION EA 1 450.00 1 $450.00 <br />10 12" RCP, CLASS 5 LF 25 75.00 8 $600.00 <br />11 12" RCP, FLARED END SECTION EA 2 750.00 2 $1,500.00 <br />12 RIPRAP, CLASS 3 CY 30 105.00 29 $3,045.00 <br />13 SODDING SY 100 15.00 100 $1,500.00 <br />14 SEEDING ACRE 1 3000.00 0.25 $750.00 <br />15 EROSION CONTROL BLANKET SY 100 7.00 160 $1,120.00 <br />16 SILT FENCE, HEAVY DUTY LF 100 10.00 $0.00 <br /> TOTAL BASE BID $68,389.30 <br />CHANGE ORDER NO.1 <br />1 8" PVC LF 190 17.95 190 $3,410.50 <br />2 CATCH BASIN EA 2 1598.73 2 $3,197.46 <br />3 RIP RAP CLASS 3 CY 1 150.00 1 $150.00 <br />4 DITCH EXCAVATION LF 250 -6.60 250 ($1,650.00) <br /> TOTAL CHANGE ORDER NO.1 $5,107.96 <br />CHANGE ORDER NO.2 <br />1 POND EXCAVATION CY 518 -10.15 $0.00 <br />2 DITCH EXCAVATION LF 20 6.60 $0.00 <br />3 12" RCP, CLASS 5 LF 17 -75.00 $0.00 <br />4 RIPRAP, CLASS 3 CY 1 -105.00 $0.00 <br />5 SEEDING AC 0.75 -3000.00 $0.00 <br />6 EROSION CONTROL BLANKET SY 60 7.00 $0.00 <br />7 SILT FENCE, HEAVY DUTY LF 100 -10.00 $0.00 <br /> TOTAL CHANGE ORDER NO.2 $0.00 <br /> <br />TOTAL BASE BID <br />TOTAL CHANGE ORDER NO.1 <br />TOTAL CHANGE ORDER NO.2 <br />TOTAL WORK COMPLETED TO DATE <br /> <br />$68,389.30 <br />$5,107.96 <br />$0.00 <br />$73,497.26 <br /> <br />61604140REQ4.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.