Laserfiche WebLink
<br />Mr. Do!!"" Larson <br />September S. 2U05 <br />fJagL: 1 <br /> <br />County by having the backage road available for traffic. we would consiuer applying a portion of <br />these savings to the City's cost in constructing the backage road. Because we have not yet begun <br />the final design on the construction staging plan. we cannot commit to any actual tinancial <br />contributions at this time. <br /> <br />As shown on the enclosed layout. the medians on 20lh Avenue will extend past the <br />property located at #7129 north of CSAH 14 and just short of the entrance located at #7091-7097 <br />south of CSAI-l 14 as a part of this project. Whi Ie these are the extents of the medians under this <br />particular project. it should be noted that these medians are very likely to be extended with future <br />improvements to CSAH 21 or CR 54. <br /> <br />While the MnJDOT Traflic Engineering Manual and the rv1innesota Manual of Uniform <br />Traffic Control Devices (MnMUTCD) arc explicit in how crosswalk signage and pavement <br />markings arc to be installed. there is little direct guidance proviclL:d on the placement of <br />crosswalks at locations other than controlled intersections (signalized or all-way stopl or at <br />school zones. It is my understanding that the City is requesting crosswalks at lpeations other <br />then Centerville Road and 20th A venue. Crosswalk placement needs to be based on good <br />engineering judgment after considering pedestrian volume and generating si tes. roauv.;ay speed <br />limits. and capacity/gap study analysis. The evaluation of potential crosswalks that the City <br />would like to consider will be done as a part of our final design process. <br /> <br />The County \Vas not under the assumption that your enhancement grant application was <br />for urban appurtenances such as street lighting. landscaping. etc. With regards to funding the <br />trail itself. the County has offered to municipalities where trails have heen funded hy the city as a <br />part of the highway construction project. is to apply for Met Council Trail funds. and if receivcd, <br />to reimburse the city for their actual costs. Again the city would pay for the initial cost of <br />construction. but could be repaid at an undclined later date if funds became available. We would <br />agree to apply for these funds. <br /> <br />This project is escalating into a very expensive project and we arc not cxtending side- <br />street limits any further than necessary to provide reasonable termini. Therefore, we would <br />extend construction on Centervillc Road only at I OooA) City's cost. This is consistent with recent <br />projects in other communities. <br /> <br />Enclosed. please find the following attached items: <br /> <br />. Plan Layout "Exhibit A" dated.luly 29, 2005 <br />. Flap "A" Interchange Layout dated .luly 29. 2005 <br />. Estimate of Cost "Exhibit CoO <br />. Standard Cost Sharing Policy "Exhibit DO" <br /> <br />/i <br />