Laserfiche WebLink
<br />PBXperts, Inc. <br />1881 Prairie Drive <br />Centerville, MN 55038 <br />651.777.1401 <br /> <br />Name I Address <br /> <br />CITY OF CENTERvnLE <br />PAUL 1 PAIZER <br /> <br />Estimate <br /> <br />Date Estimate # <br /> <br />12/14/2007 14646 <br /> <br /> Project <br /> #3712 PUBLIC WORKS <br />Desaiption Qty Cost Total <br />Install, terminate and test: 1 1,800.00 1,800.00 <br />seven (7) dual Cat3/Cat 5 wire runs <br />one (1) Cat3 wire run for phone at back of shop <br />two (2) Cat3 wire nms from building telephone demarc to switch <br />room <br />one (1) CatSe wire nm from building data demarc to switch room <br />Design, program and install Partner ACS telephone system with <br />seven (7) telephones, two phone lines and one fax line. <br />Provide .5 hour of end-user training on new telephones and <br />voicemail. <br />Ifrequired to install cabling, a lift will be billed on a per-day basis. <br />Parbler ACS R7.0 1 763.00 763.00 <br />Partner Messaging, 2 Port 1 910.00 910.00 <br />Partner 2 Slot Carrier 1 49.00 49.00 <br />Partner 18 Display - Black, New 7 194.60 1,362.20 <br />Wire Cat3-W 1,000 0.15335 153.35 <br />Wire Cat5e -L 1,000 0.27 270.00 <br /> <br />*Sales tax will be applied to all taxable customer, or other contractors, will be <br />items according to Minnesota State Law billed above and beyond the scope of work <br />when applicable. as listed in this estimate. <br />* Any and all work beyond the scope of this <br />estimate will be billed on a Time and PAYMENT TERMS <br />Material basis. *The proposed pricing, configurations, and <br />* All line items for parts/wire are estimates terms set forth in this estimate are valid for <br />of what will be required for the scope of 30 days from the date of this estimate. <br />work. Final invoice will reflect actual parts Your signature on the line below will <br />and quantity used. indicate your approval of this estimate and <br />· Any and all time required to install or authorize us to proceed. Upon your <br />troubleshoot Tl '8 and/or dial tone not approval of this estimate a down payment <br />included in this estimate will be treated as of500A. of the estimate total will be <br />separate Time and Material charge. required. Work will be scheduled to begin <br />· Time spent troubleshooting customer once we have received this signed estimate <br />provided equipment or wiring found to be and the 5001'0 down payment. <br />faulty, will be billed as Time and Material. *Payment of the remaining balance is due <br />· Any delays not caused by our upon completion of the project. <br />techniciansl~ including delays created Outstanding balances are subject to a <br />by or due to construction, finance charge of 1.5% per month. <br /> <br />Page 1 <br /> <br />Subtotal <br /> <br />Sales Tax (6.50/0) <br /> <br />Total <br /> <br />Authorized Customer Representative <br /> <br />Date <br />Thank you for the opportunity to present this <br />estimate to}{lll. If you have any questions or if <br />there is any way in which we can be of fmther <br />assistance, please do not hesitate to contact us. <br /> <br />63 <br />