Laserfiche WebLink
<br /> <br />The proposed activity must comply with applicable regulations that meet the Slum/Blight National Objective. Identify how your <br />activity meets the condition and substandard designation. <br /> <br />A. What type of elimination is this project addressing (CHOOSE ONE): D Area Basis <br />D Spot Basis <br /> <br />B. Identify the site location or boundaries. <br /> <br />C. Provide the percent of building or public improvements that were deteriorated when the project was designated and <br />the year of designation: _ % designated: _ year <br /> <br />D. Public Improvement I Type Condition: <br /> <br />E. Describe the conditions that qualify the project as slum or blight. <br /> <br /> <br />If your project addresses housing acquisition, rehabilitation or new construction, answer the following questions: <br /> <br />A. Type of Housing D Single Family D Multi Family DSRO <br /> <br />D 2, 30r4-Plex D Townhome DOther <br /> <br />B. How many units are: Owner Occupied Renter Occupied <br /> <br />C. Total number of units overall in project (occupied and vacant): <br /> <br />D. If applicable, what is the number of expected completion units in regards to the following categories? <br />Section 504 accessible units <br />_ Qualify as Energy Star Standards <br />_ Occupied by elderly (62+) <br />_ Brought from substandard to standard <br />_ Brought into compliance with lead based paint rules <br />_ Designated for persons with HIV/AIDS <br />_ Designated for chronically homeless <br /> <br /> <br />Federal requirements mandate the completion of an environmental review prior to any actions being initiated on a <br />project receiving federal funding. <br /> <br />A. Is your project currently underway? <br />a. D Yes, construction has begun <br />D Project has already completed a federally accepted environmental review <br />b. IZI No, will not begin before the environmental review is completed by Anoka County. <br /> <br />B. Does the project include repair, rehabilitation or conversion of existing building/facilities? <br />a. If yes: What year were structures built on this property? <br /> <br />C. Does the project involve new construction, acquisition of undeveloped land or any construction that requires <br />ground disturbance? IZI Yes D No <br /> <br />D. HUD Noise Abatement and Control <br />a. Distance from the nearest railroad? IZI More or D Less than 3,000 ft <br />b. Distance from the nearest major roadway? D More or IZI Less than 1,000 ft <br />c. Distance from the nearest municipal or military airport? IZIMore or D Less than 5 miles <br /> <br />E. Wetlands Protection <br />a. Is there a wetland associated with your proposed project? DYes IZI No <br /> <br />2008 AC Project COSG Application - Page 4 <br />;j() <br />