My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 CC Minutes
Centerville
>
City Council
>
Minutes
>
1990-1999
>
1998
>
1998 CC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2006 8:40:23 AM
Creation date
9/16/2005 10:14:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />to the questions during the interview process. The point total for each firm was as follows: <br />BRW (229), Bolton and Menk (200), Bonestroo (255) and HR Green (206). <br /> <br />Discussion occurred on the problems associated with the Eagle Pass and Parkview development. <br />It was mentioned that problems will occur with any engineering firm, but the key issue is how the <br />firm tends to deal with their mistakes. The consensus was that the firm of Bon est roo, Rosene, <br />Anderlik and Associates was worth investigating more closely. Staff was asked to contact <br />Bonestroo to investigate their thoughts on stepping in to the various projects that were pending <br />and on-going within the City. Staffwas also asked to develop a list of projects that the City is <br />facing as well as the status of current projects. Staffwas asked to investigate the satisfaction of <br />Arden Hills with their selection of Bon est roo as consulting engineer. <br /> <br />Staff will provide the information to the City Council prior to the regular meeting on August 26. <br />The City Council will take official action on selecting a consulting engineer at the meeting on <br />August 26. <br /> <br />The flashing lights for the school cross-walk was discussed. Mr. March indicated that a meeting <br />was held with representatives from the school, Anoka County and the engineering firm ofWSB. <br />The result of the school crossing report was reviewed at the meeting. The report indicated that <br />warrants were not met for a flashing beacon system for the crosswalk. Mr. March indicated that <br />the City would have to work in conjunction with the school district to hire an engineering firm to <br />design the lights and then hire a firm to install the lights. The total cost is estimated at $12,000. <br />The consensus was to proceed with the project to have the lights installed as soon as possible. <br />The County will be making signage improvements in the area prior to the start of school. It was <br />mentioned that County Commissioner Langfeld should be invited to a future meeting to discuss <br />this issue. <br /> <br />The 1999 budget was discussed. It was noted that a levy of at least $700,000 would be needed to <br />cover the increased costs from going to 24 hour police protection. It was noted that it is <br />important for the Council members to be present at the police budget workshop on August 24, <br />1998. A workshop was scheduled for September 2, 1998 at 6:00 to further work on refining the <br />budget so that the initial levy amount can be certified prior to September 15. <br /> <br />The City web site was briefly discussed. The consensus was to proceed with launching the web <br />site. The City would have to pay $175 to register a domain name for two years. The City would <br />then pay $50 per month to have the site hosted with the ability to update the site on a regular <br />basis. It was mentioned that no home addresses or phone numbers should be included on the <br />web site. <br /> <br />Mayor Wilharber indicated that the interviews had been held for the position of <br />Circle-PineslLexington Police Chief. <br />
The URL can be used to link to this page
Your browser does not support the video tag.