My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-08 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
01-23-08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2008 9:53:41 AM
Creation date
1/18/2008 9:53:19 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />." Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1 - SITE GRADING: <br />1 MOBILIZATION LS 1 18000.00 1 $18,000.00 <br />2 TRAFFIC CONTROL LS 1 550.00 1 $550.00 <br />3 TEMPORARY ROCK CONSTRUCTION ENTRANCE TN 35 25.00 47 $1,175.00 <br />4 REMOVE CONCRETE CURB AND GUTTER LF 100 3.50 71 $248.50 <br />5 REMOVE STORM SEWER PIPE LF 28 23. 00 28 $644.00 <br />6 REMOVE BITUMINOUS/GRAVEl DRIVEWAY & TRAIL SY 500 1.60 575 $920.00 <br />7 SILT FENCE, MACHINE SLICED LF 620 1.65 230 $379.50 <br />8 PROTECTIVE FENCING LF 1350 1.95 970 $1,891.50 <br />9 EROSION CONTROL BLANKETS, CATEGORY 3 SY 660 1.75 398 $696.50 <br />10 CLEAR AND GRUB TREE 10 1100.00 11 $12,100.00 <br />11 TREE PRUNING / TRIMMING EA 4 890.00 4 $3,560.00 <br />12 COMMON EXCAVATION (EV) CY 500 3.00 500 $1,500.00 <br />13 SUBGRADE EXCAVATION (EV) CY 100 6.00 95 $570.00 <br />14 GRANULAR BORROW (CV) CY 100 aoo 95 $1,235.00 <br />15 SUBGRADE PREPARATION SY 700 1.50 654 $981.00 <br />16 STRIP, STOCKPILE, RESPREAD EXISTING TOPSOIL LS 1 7700.00 1 $7.700.00 <br />17 TOPSOIL BORROW (LV) CY 200 25.00 229.2 $5,730.00 <br />18 FURNISH & INSTALL RAIN GARDEN SOIL MIX (CV) CY 80 70.00 105.72 $7,400.40 <br /> TOTAL PART 1 - SITE GRADING: $65,281.40 <br /> PART 2 - WATER MAIN: <br />19 1. CURB STOP AND BOX EA 1 108.00 1 $108.00 <br />20 3/4. CURB STOP AND BOX EA 2 92.00 2 $184.00 <br />21 CONNECTTO EXISTING WATER SERVICE EA 1 325.00 1 $325.00 <br />22 CONNECT TO EXISTING 1" STEEL ARTESIAN WELL PIPE EA 1 650.00 1 $650.00 <br />23 3/4" TYPE "K" COPPER WATER SERVICE LF 100 30.00 75 $2,250.00 <br /> TOTAL PART 2 - WATER MAIN: $3,517.00 <br /> PART 3 - STORM SEWER: <br />24 15" HDPE STORM SEWER LF 48 25.00 43 $1,075.00 <br />25 10" HDPE STORM SEWER LF 40 21.00 36 $756.00 <br />26 12" HDPE OUTFLOW WITH BEEHIVE LF 20 55.00 30 $1.650.00 <br />27 15" HDPE FLARED END SECTION EA 1 315.00 1 $315.00 <br />28 12" HDPE FLARED END SECTION EA 1 310.00 1 $310.00 <br />29 10" HDPE FLARED END SECTION EA 4 310.00 $0.00 <br />30 CONNECTTO EXISTING CATCH BASIN EA 1 650.00 1 $650.00 <br />31 ORNAMENTAL SLAB LIMESTONE OUTFLOW STRUCTURE EA 2 2780.00 2 $5.560.00 <br /> TOTAL PART 3 - STORM SEWER: $10,316.00 <br /> PART 4 - TRAILS AND EQUIPMENT PADS: <br />32 GEOTEXTlLE FABRIC, TYPE V SY 700 1.50 654 $981.00 <br />33 <br /> AGGREGATE BASE, CLASS 5, 100% CRUSHED LIME ROCK - TRAIL AND PADS TN 266 30.00 9.91 290 $8.700.00 <br />34 SURMOUNTABLE CONCRETE CURB AND GUTTER LF 100 22.'00 71 $1,562.00 <br />35 4' CONCRETE SIDEWALK SF 200 5.00 13 213 $1,065.00 <br />36 TRUNCATED DOME PANEL SF 24 20.00 16 $320.00 <br />37 ZEBRA CROSSWALK - EPOXY SF 126 10.00 90 $900.00 <br /> TOTAL PART 4 - TRAILS AND EQUIPMENT PADS: $13,528.00 <br /> PART 5 - SITE FURNISHINGS: <br />38 BENCHES - DuMor 88-60PL-S-l EA 3 1050.00 3 $3,150.00 <br />39 GLIDER BENCH - DuMor 30-6'-S-1 EA 1 1840.00 1 $1,840.00 <br />40 LITTER / RECYCLING RECEPTACLES - 41-32PL-2-1 EA 2 840.00 2 $1,680.00 <br />41 GRILLS - DuMor 21-00-S-1 EA 2 590.00 2 $1,180.00 <br />42 BIKE RACK - DuMor 130-20-S-1 EA 1 640.00 1 $640.00 <br />43 DRINIKING FOUNTAIN - MOST DEPENDABLE MODEL 440 DB EA 1 3700.00 1 $3,700.00 <br /> TOTAL PART 5 - SITE FURNISHINGS: $12,190.00 <br /> <br />61607155REQ4.l<ls <br />
The URL can be used to link to this page
Your browser does not support the video tag.