Laserfiche WebLink
<br />DRAFT <br /> <br />2/812008 <br /> <br />EXHmIT E <br />LANDFILL, GRADING AND EXCAVATING PERMIT FEES <br /> <br />GRADING FEES <br /> <br />General. Fees shall be assessed in accordance with the provisions oflhis section or shall be as set forth in the fee <br />schedule adopted by the jurisdiction. <br /> <br />Plan Review Fees. When a plan or other data are required to be submitted, a plan review fee shall be paid at the <br />time of submitting plans and specifications for review. Said plan review fee shall be set forth in Table A33-A. Separate <br />plan review fees shall apply to retaining walls or major drainage structures as required elsewhere in this code. For <br />excavation and fill on the same site, the fee shall be based on the volume of excavation or fill, whichever is great<<. <br /> <br />Grading Permit Fees. A fee for each grading permit shall be paid to the City as set forth in Table A33-B. Separate <br />permits and fees shall apply to retaining walls or major drainage structures as required elsewhere in this code. There <br />shall be no separate charge for standard terrace drains and similar fucilities. <br /> <br />TABLE A33-A GRADING PLAN REVIEW FEES <br /> <br />50 cubic yards (38.2 m3) or less....................................................................................... No Fee <br />51 to 100 cubic yards (40 m3 to 76.5 m3) ........................................................................ $37.01 <br />101 to 1,000 cubic yards {77.2 m3 to 764.6 m3)............................................................... $58.28 <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) ...................................................... $77.57 <br />10,001 to 100,000 cubic yards (7646.3 to 7645.5 m3) - $77.57 for the first <br />10,000 cubic yards (7645.5 m3), plus $38.59 for each additional <br />10,000 cubic yards (7645.5 m3) or fraction thereof. <br />100,001 to 200,000 cubic yards (7645.6 m3 to 15,291.1 m3) - $424.86 fur the <br />first 100,000 cubic yards (7645.5 m3), plus $20.87 for each additional <br />10,000 cubic yards (7645.5 m3) or fractioo thereof. <br />200,001 cubic yards (l5,291.2 m3) or more - $633.55 for the first $200,000 cubic <br />yards (15,291.1 m3), plus $11.42 for each additional 10,000 cubic years <br />(7645.5 m3) or fraction thereof. <br /> <br />Other Fees: <br /> <br />Additional plan review required by changes, additioos or revisions to approved plans <br />{minimum charge - one-halfhour)................................................................................... $79.54 per hour' <br /> <br />'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, <br />equipment., hourly wages and fringe benefits of the employees involved. <br /> <br />GRADING PERMIT FEES' <br /> <br />50 cubic yards (38.2 m3) or less....................................................................................... $37.01 <br />51 to 100 cubic yards (40 m3 to 76.5 m3) ........................................................................ $58.28 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $58.28 fur the first 100 cubic yards <br />(76.5 m3), plus $27.56 fur each additiona11oo cubic yards (76.5 m3) or fraction <br />thereof. <br />1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) - $306.34 fur the first 1,000 <br />cubic yards (764.6 m3), plus $22.84 for eacl1 additional 1,000 cubic yards <br />(764.6 m3) or fraction thereof <br />10,001 to 100,000 cubic yards (7,646.3 m3 to 7,645.5 m3) - $51l.88 fur the first 10,000 <br />cubic yards (7,645.5 m3), plus $103.95 fur each additiona1lO,Ooo cubic yards <br />(7,645.5 m3) or fraction thereof. <br />100,001 cubic yards (7,645.6 m3) or more - $1,447.43 for the first 100,000 cubic yards <br />(7,645.5 m3), plus $57.49 fur each additional 10,000 cubic yards (7,645.5 m3) <br />Page 12 ofl4 <br />