Laserfiche WebLink
<br />DRAFT <br /> <br />2113/2008 <br /> <br />EXHIBIT E <br /> <br />LANDFILL, GRADING AND EXCA V A TlNG PERMIT FEES <br /> <br />GRADING FEES <br /> <br />General. Fees shall be assessed in accordance with the provisions ofthis section or shall be as set forth in the fee <br />schedule adopted by the jurisdiction, <br /> <br />Plan Review Fees. When a plan or other data are required to be submitted, a plan review fee shall be paid at the <br />time of submitting plans and specifications for review. Said plan review fee shall be set forth in Table A33-A. Separate <br />plan review fees shall apply to retaining walls or major drainage structures as required elsewhere in this code. For <br />excavation and fill on the same site, the fee shall be based on the volume of excavation or fill, whichever is greater. <br /> <br />Grading Permit Fees, A fee for each grading permit shall be paid to the City as set forth in Table A33-B. Separate <br />permits and fees shall apply to retaining walls or major drainage structures as required elsewhere in this code, There <br />shall be no separate charge for standard terrace drains and similar facilities. <br /> <br />TABLE A33-A GRADING PLAN REVIEW FEES <br /> <br />50 cubic yards (38.2 m3) or less" ".""""""""...""""""""" '"'''''''''''''''''''''''''''''''' .".""", No Fee <br />5] to 100 cubic yards (40 m3 to 76.5 m3)"", "".""""",,, "'"'''''''' ".."""""",,, "'''''''''' $37.01 <br />101 to 1,000 cubic yards (77,2 m3 to 764,6 m3)"""", """""'"'''''''''''''''''''''''''''''' ..".""", $58.28 <br />],001 to ]0,000 cubic yards (765.3 m3 to 7645,5 m3)" """""""""",. """"""""""" ."."" $77.57 <br />10,00] to 100,000 cubic yards (7646.3 to 7645.5 m3) - $77.57 for the first <br />10,000 cubic yards (7645.5 m3), plus $38.59 for each additional <br />] 0,000 cubic yards (7645.5 m3) or fraction thereof. <br />100,001 to 200,000 cubic yards (7645.6 m3 to ]5,29].1 m3) - $424.86 for the <br />first 100,000 cubic yards (7645.5 m3), plus $20.87 for each additional <br />10,000 cubic yards (7645,5 m3) or fraction thereof, <br />200,00] cubic yards (15,291.2 m3) or more - $633,55 for the first $200,000 cubic <br />yards (15,291.1 m3), plus $11.42 for each additional 10,000 cubic years <br />(7645,5 m3) or fraction thereof. <br /> <br />Other Fees: <br /> <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour) , ""''''''''''''', "''''',,,,,,,,,,,,,'''''',,,,'''''',, "''',,,,,''''',,. """, $79.54 per hour' <br /> <br />'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, <br />equipment, hourly wages and fringe benefits of the employees involved. <br /> <br />GRADING PERMIT FEES' <br /> <br />50 cubic yards (38.2 m3) or less """""""...""""",,"",,, ",,,,,,,,,,,,,"""",""""""""'"'''''''''' $37,01 <br />SI to 100 cubic yards (40 m3 to 76.5 m3)"""""""""""""..."""""""""."""""""""""""" $58,28 <br />101 to 1,000 cubic yards (77,2 m3 to 764,6 m3) - $S8,28 for the first 100 cubic yards <br />(76,S m3), plus $27,56 for each additional 100 cubic yards (76,5 m3) or fraction <br />thereof. <br />],001 to ]0,000 cubic yards (765.3 m3 to 7,64S,S m3) - $306.34 for the first 1,000 <br />cubic yards (764,6 m3), plus $22,84 for each additional 1,000 cubic yards <br />(764,6 m3) or fraction thereof. <br />] 0,00] to ]00,000 cubic yards (7,646,3 m3 to 7,645,5 m3) - $511.88 for the first /0,000 <br />cubic yards (7,645.5 m3), plus $103,95 for each additional 10,000 cubic yards <br />(7,645.5 m3) or fraction thereof. <br />100,00] cubic yards (7,645,6 m3) or more - $1,447.43 for the first 100,000 cubic yards <br />(7,645.5 m3), plus $57.49 for each additional/O,OOO cubic yards (7,645,5 m3) <br /> <br />Page 12 of 14 <br />