My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-26 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-03-26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2008 8:27:49 AM
Creation date
3/26/2008 8:27:27 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br /> <br />SELECTION GUIDELINES: <br />Formal application, rating of education and experience; oral interview and reference <br />check; pre-employment physical and drug screen. The consultant city engineer should be <br />involved in the selection process, since the inspection duties are subject to the supervision <br />of the consultant city engineer. <br /> <br />The duties listed above are intended only as illustration of the various types of work that <br />may be performed. The omission of specific statements of duties does not exclude them <br />from the position if the work is similar, related or a logical assignment to the position. <br /> <br />This job description does not constitute an employment agreement between the employer <br />and employee and is subject to change by the employer as the needs of the employer and <br />the requirements ofthe job change. <br /> <br />I have read and understand the contents and descriptions of this job description. That I <br />have had the opportunity to ask any questions and have them answered. <br /> <br />Signed: <br /> <br />Date: <br /> <br />S :\Administrator\Personncl\Job lJescriptions\Projcct coordinator-inspec12008.DOC <br />Page 5 of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.