Laserfiche WebLink
<br />Specific Components and Notes: <br />BMP 6-1: Pond and Outfall Inspection and Cleaning Procedure Program <br />. Outfall cleaning procedures and inspection schedule <br />. Pond cleaning procedures and inspection schedule <br />. Keep records of inspection results, date and any maintenance performed or recommended <br />BMP 6-2: Stonn Drainage System Inspection and Cleaning <br />. Culvert and inlet cleaning and inspection schedule <br />. Removal offoreign items, trash and debris can prevent illicit discharges to the MS4. <br />. Visual inspections allow for potential detection of dry weather flow or other out of the ordinary stormwater <br />occurrences. <br />BMP 6-5: Pollution Control Device Inspection and Cleaning Program <br />. Pollution control device inspection schedule <br /> <br />Responsible Party for this BMP: <br />Name: Paul Palzer <br />Department: Public Works <br />Phone: (651) 429-3232 <br />E-mail: ooalzer@centervillemn.com <br /> <br />Page 62 of 67 <br />