My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-04-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2008 3:47:53 PM
Creation date
4/4/2008 3:19:31 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br /> <br />GPM - Gallons per Minute MOD Million Oallo11s per Day <br />D. DEMAND PROJECTIONS. <br /> <br />TABLE 5 T Y <br /> <br />D <br /> <br />d P . <br /> <br /> en ear eman rOJectlons <br />Year Population Average Day Maximum Projeded <br /> Senred Demand Dav Demand Demand <br /> (MGDl (MGDl (MGYl <br />2008 2350 .262 .681 95.7 <br />2009 3227 .360 .936 131.5 <br />2010 3755 .419 1.089 153.0 <br />2011 4005 .447 1.162 163.2 <br />2012 4160 .464 1.206 169.5 <br />2013 4265 .476 1.238 173.8 <br />2014 4370 488 1.269 178.0 <br />2015 4475 499 1.297 182.3 <br />2016 4580 .511 1.329 186.6 <br />2017 4685 523 1.360 190.9 <br /> <br />MOD - Million Gallons per Day MGY - Million Gallons per Year <br /> <br />Projection Method. Describe how projections were made, (assumptions for per capita, per <br />household, per acre or other methods used). <br />Population projections based on current Comprehensive Plan(2008). Population Served <br />projections reflect a pending water project in 2009 and city ordinance requiring connection of all <br />residents by 2012. ADD and MOD based on actual per capita average and actual max demand <br />over last 5 years. <br /> <br />E. RESOURCE SUSTAIN ABILITY <br /> <br />Sustainable ,,:ater use: use of water to provide for the needs ofsociety~ nol\' and in <br />the future, ,,'ithout unacce table social, economic, or environmental conse uences. <br /> <br />Monitoring. Records of water levels should be maintained for all production wells and source <br />water reservoirs/basins Water level readings should be taken monthly for a production well or <br />observation well that is representative of the wells completed in each water source formation. If <br />water levels are not currently measured each year, a monitoring plan that includes a <br />schedule for water level readings must be submitted as Attachment A. <br /> <br />TABLE 6 Monitorin Wells - List all wells bein <br />Unique well Type of well <br />number (production, <br />observation <br />roducin <br />roducin <br /> <br />511091 <br />512748 <br /> <br /> <br /> <br /> <br />Method of <br />Measurement (steel <br />ta e, SCADA etc. <br />Ta e <br />Ta e <br /> <br />O:\PlalUling COITUnission\Comp Plan Update\Walcr COLlSl..'1Vution Ptan\2007 \VaL..'T oon!'J.."rVatio\\ v4.dQC <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.