Laserfiche WebLink
<br />DRAFT <br />proposed changes (CIP Attachment B). <br />Third water supply well in six to eight years. Not in current five-year CIF. <br /> <br />Proposed Water Sources. Does your current CIP include the addition of new wells or intakes? <br />DYes [g] No If yes, list the number of new installations and projected water demands from <br />each for the next ten years. Plans for new production wells must include the geologic source <br />formation, well location, and ro osed urn in ca acit <br />Not yet in plan, but expect one new well about year 20] 5 to Prairie du Chien/Jordan, 1000 gpm. <br /> <br />Water Source Alternatives If new water sources are being proposed, describe alternative <br />sources that were considered and any possibilities ofjoint efforts with neighboring communities <br />for development of supplies. <br />Would consider purchasing wholesale from Lino Lakes(water system interconnect). Lino Lakes <br />doesn't appear to have adequate capacity given their fast community growth and they have been <br />purchasing water from Blaine. <br /> <br />Preventative Maintenance. Long-term preventative programs and measures will help reduce the <br />risk of emergency situations. IdentifY sections of the system that are prone to failure due to age, <br />materials or other problems. This information should be used to prioritize capital improvements, <br />preventative maintenance, and to determine the types of materials (pipes, valves, couplings, etc) <br />to have in stock to reduce repair time. <br />Replace corroded bolts on gate valves and hydrants. Replace aging mains in conjunction with <br />street projects. <br /> <br />O:\Plmming Commission\Comp Plan l:pdatc\Watcr Conscn'ation Plan\2007 Wal..:r conservation v4.doc <br />7 <br />