Laserfiche WebLink
<br />BMP Summary Sheet <br /> <br />MS4 Name: City of Center vi lie <br /> <br />Minimum Control Measure: 4-CONSTRUCTlON SITE STORM WATER RUNOFF <br />CONTROL <br /> <br />Unique BMP Identification Number: 4d-1 <br /> <br />BMP Title: Procedure for Site Plan Review <br />BMP Description: <br />BMP 4-1: Erosion and Sediment Control (ESC) Plan ReQuirement and Review Process <br />The City requires an Erosion and Sediment Control plan to be submitted during the site plan review process. <br />Upon adoption of the Surface Water Management Plan, the City will implement the Erosion and Sediment <br />Control Policy for New Developments. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />The information included or referenced on this Summary Sheet is intended to meet all SWPPP requirements for this <br />BMP. <br />Measurable Goals: <br />. Number of plans reviewed by watershed <br />Timeline/Implementation Schedule: <br />. 2006-20 II: This activity currently exists and implementation is on going. <br />Specific Components and Notes: <br />. Timeframe for review <br />. Financial security/Letter of credit <br />. Coordination with the Rice Creek Watershed District <br />. This BMP will coordinate with the City SWMP upon council adoption and will adopt the procedures and <br />recommendations of the MPCA's Protecting Water Quality in Urban Areas: Best Management Practicesfor <br />Minnesota and Minnesota Storm water Manual. <br />Responsible Party for this BMP: <br />Name: Paul Palzer <br />Department: Public Works <br />Phone: (651) 429-3232 <br />E-mail: DDalzerlalcenterv i Ilemn .com <br /> <br />Page 46 of 67 <br />