My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-28 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-05-28 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2008 8:55:00 AM
Creation date
5/22/2008 8:54:15 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centerville <br />City Council Work Session Minutes <br />May 14,2008 <br /> <br />Mayor Capra stated that the projects delayed from 2004 should definitely be completed. <br /> <br />Councilmember Lakso inquired about what would need to be done with the storm sewers. <br /> <br />City Engineer Statz replied that it would not be worthwhile to do the storm sewers if they <br />are not doing the road itself - except for the ones in bad shape. <br /> <br />Councilmember Broussard-Vickers stated that forcing hook up to the water main was her <br />biggest issue going forth. She stated that, since the water system is working and we have <br />enough loops, it would not compromise the system if we do not continue to expand it. <br /> <br />Discussion ensued regarding the cost savings of doing the reconstruction without putting <br />in the water line; however, the residents would have to bear 100% of the costs later. <br /> <br />Councilmember Parr suggested that, if it was a full reconstruct, the water line should be <br />put in. If a reconstruct was not needed, the water line would not be put in. <br /> <br />Mayor Capra stated that the optimum time to put the water line in is when they had <br />development going in, as the road would already be opened up. She added that they have <br />to have a date in the Ordinance. She could call a motion to rescind that date or push the <br />date out further. <br /> <br />Councilmember Lee asked City Administrator Larson for a spreadsheet, showing the <br />costs for commercial and residential water. He stated that our water usage fee is not <br />adequate, and there is no way to enforce it unless we have a drop-dead date. <br /> <br />Councilmember Parr stated that residents are putting wells where they should not be <br />placed. <br /> <br />City Engineer Statz showed some slides, explaining different cost options - between <br />doing nothing to the full project. <br /> <br />Discussion ensued regarding only doing mill and overlay in some areas vs. a full <br />reconstruct. <br /> <br />Mayor Capra stated that they would have another Work Session to discuss trails and <br />sidewalks next Wednesday, May 21. <br /> <br />City Attorney Glaser stated that anyone who wants to challenge the assessment can come <br />to the meeting or do it in writing without an attorney. He added that the burden of proof <br />would be on them to prove the assessment is not correct. <br /> <br />III. ADJOURNMENT <br /> <br />Mayor Capra adjourned the City Council Work Session Meeting at 7:45 p.m. <br /> <br />Page 2 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.