My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-04 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2008
>
2008-06-04 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2008 2:25:05 PM
Creation date
5/30/2008 2:24:51 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />iJilatural Shore Technologies, Inc. <br /> <br />"II.' www.NaturaIShore.com <br />~,~ <br />l <br /> <br />~275 FagenkopfKoad, Maple Flain, MN 55359 <br /> <br />612-703-758 I <br /> <br />27 May 2008 <br /> <br />RE: Centerville Lake Project Bid <br /> <br />Hello Mark- <br /> <br />Below is a breakdown for the Centerville Lake Park Shoreland Restoration <br />Project. As we discussed with Gregg on site, it makes sense to conduct the <br />restoration during summer low water. The rock gabions should be set <br />approximately 12" below the lake bottom substrate. In order to do this, it would <br />be most efficient to have the substrate exposed when conducting this excavation. <br />I also talked to Gregg about using gabions that are 3'x3' in dimension. This <br />would allow for stability and also allow a portion of the gabion to be set above the <br />NWL. Plants associated with the restoration will have ample time to establish. <br /> <br />The quoted price is for 220' of shoreland. We have itemized a list of materials <br />that we typically use in projects like these. We have also included maintenance <br />in the bid - if you would like for us to monitor and weed the site. <br /> <br />Project Elements <br />Project Management, Mobilization <br />Site preparation, excavation, soil, gab ion placement <br />Plants and seed <br />Erosion Control Materials - gabion boxes, rock, biologs, <br />fabric <br /> <br />Maintenance <br /> <br />TOTAL = <br /> <br />$2,000 <br />$6,540 <br />$3,193.00 <br /> <br />$14,635.00 <br />$960.00 <br />$27,328.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.