Laserfiche WebLink
<br /> <br />I, <br />, <br /> <br />~XHIBIT A <br />BUILDING PERMIT F~ES <br /> <br />TOTAL VALUATION <br /> <br />FEE <br /> <br />$10.00 <br /> <br />$10.00 for the first $500.00 plus <br />$1.50 for each additional $100.00 <br />or fraction thereof. to and includ. <br />ing $2,000.00. <br /> <br />$)2.50 for the first $2,000.00 plu: <br />$6.00 for each additional $1.000.0( <br />or fraction thereof, to and includ. <br />$25.000.00. <br /> <br />$170.50 for the first $25,000.00 p~ <br />$4.50 for each additional $1.000.0( <br />or fraction thereof, to and includ. <br />ing $50,000.00. <br /> <br />$28).00 for the first $50,000.00 <br />~lus $3.00 for each additional <br />$1,000.00 or fraction thereof, to <br />and including $100,000.00. <br /> <br />$433.00 for the first $100,000.00 <br />~lus $2.50 for each additional <br />$1,000.00 or fraction thereof. <br /> <br />Reinspection fee. The fee for each reinspection shall be $15.00. <br /> <br />$1.00 to $500.00 <br />$501.00 to $2,000.00 <br /> <br />$2,001.00 to $25,000.00 <br /> <br />$25,001.00 to $50,000.00 <br /> <br />$50,000.00 to $100,000.00 <br /> <br />$100,001.00 and up <br /> <br />Plan-Checking fees for building of Groups R. Division J and M <br />Occupancies shall be one-half (t) of the building permit fee. <br />Plan-Checking fees for all other buildings shall be 65% of <br />the building permit fees as set forth. <br /> <br />PLUMBING PERMIT F~BS <br /> <br />$5.00 for first opening, $2.00 for each and all additional <br />openings, plus a 50i city fee. <br />