Laserfiche WebLink
<br />. Utl/ti/OU <br /> <br />(1) Drainage ditches or channels shall have a minimum gradient of one percent; <br /> <br />(2) Open watercourses shall have adequate capacity and erosion control to ensure safe and <br />healthful disposal of storm water; <br /> <br />(3) When topsoil has been removed from the surface of a lot on a slope where erosion will <br />cause a displacement of loose material, the subdivider shall be required to seed or provide other means <br />to prevent the wash from damaging adjacent property or accumulating on street surfaces; and <br /> <br />(4) Design of storm drainage facilities shall be compatible with adjacent areas, including the <br />extension of abutting existing storm sewers. Design of all drainage structures shall be based on the 5- <br />year occurrence for design intensity using runoff coefficient and concentration times as determined by <br />the City Engineer. <br /> <br />(D) Water supply. Where public water supply is available, as determined by the Council, the <br />subdivider shall connect to the public water supply and construct a system of water mains with a <br />connection for each lot. The minimum size of water mains shall be six inches and the minimum size of <br />private water services shall be one inch. Water mains and services for commercial and industrial uses <br />or for the extension of major trunks shall be determined by the City Engineer. If private wells are to be <br />permitted, they shall be constructed in conformance with City Code and Minnesota Statutes and Rules. <br /> <br />(E) Sewers. All plats within the urban service area shall be connected to the municipal sewer <br />system. <br /> <br />(F) Utilities. Every lot in a subdivision shall be capable of being served by utilities, and <br />easements acceptable to the utility companies shall be provided. Electric, gas and other utility <br />distribution lines shall be installed within public rights-of-way or within properly designated <br />easements. To the fullest extent possible, underground utility lines shall be installed within the right- <br />of-way adjacent to but not beneath e ~ ~ lJnd pr~- ved ar ~,;",;",,-,".';}'JJ'C 10:~5~..S/Jiii'r;:; <br />~ ~---- .~.\, <br />'\. ~ ~:_~.- )/' <br />(I) Street name and traffic c ro/ si._ lfi - - Ie . ~--"devel ....... ents, the <br />dev~loper shall install ~ll stre~t nam signsp fice~ed necessar,;y the ~ity <br />Engm<<" In oomm."".hnd md", IDPl", t . op." , II .11 streett.",gns <br />and traffic control signs as deemed necessary by the City Engineer. <br /> <br />(J) Sodding. The developer must sod the front yard, boulevard and side yards to the rear of the <br />structure on every lot-the balance of the lot shall be seeded. The required sodding and seeding shall be <br />placed prior to occupancy. An escrow deposit shall be submitted to the city in a dollar amount <br />sufficient to guarantee the required sodding. <br /> <br /> <br /> <br />48 <br />