My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 Resolutions
Centerville
>
City Council
>
Resolutions
>
2000-2024
>
2001
>
2001 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 12:46:12 PM
Creation date
9/30/2005 1:15:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT B <br /> <br />GRADING PERMIT FEES <br /> <br />GRADING FEES <br /> <br />General. Fees shall be assessed in accordance with the provisions of this section or shall be as set <br />forth in the fee schedule adopted by the jurisdiction. <br /> <br />Plan Review Fees. When a plan or other data are required to be submitted, a plan review fee shall be <br />paid at the time of submitting plans and specifications for review. Said plan review fee shall be set <br />forth in Table A33-A. Separate plan review fees shall apply to retaining walls or major drainage <br />structures as required elsewhere in this code. For excavation and fill on the same site the fee shall be <br />based on the volume of excavation or fill, whichever is greater. <br /> <br />Grading Permit Fees. A fee for each grading permit shall be paid to the Building Official as set forth in <br />Table A33-B. Separate permits and fees shall apply to retaining walls or major drainage structures as <br />required elsewhere in this code. There shall be no separate charge for standard terrace drains and <br />similar facilities. <br /> <br />TABLE A33-A GRADING PLAN REVIEW FEES <br /> <br />50 cubic yards (38.2 m3) or less ................................................................. No Fee <br />51 to 100 cubic yards (40 m3 to 76.5 m3) .................................................. $35.25 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3)........................................ $55.50 <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3)................................ $73.88 <br />10,001 to 100,000 cubic yards (7646.3 to 7645.5 m3) - $73.88 for the first <br />10,000 cubic yards (7645.5 m3), plus $36.75 for each additional <br />10,000 cubic yards (7645.5 m3) or fraction thereof <br />100,001 to 200,000 cubic yards (7645.6 m3 to 15,291.1 m3) - $404.63 for the <br />first 100,000 cubic yards (7645.5 m3), plus $19.88 for each additional <br />10,000 cubic yards (7645.5 m3) or fraction thereof <br />200,001 cubic yards (15,291.2 m3) or more - $603.38 for the first $200,000 cubic <br />yards (15,291.1 m3), plus $10.88 for each additional 10,000 cubic years <br />(7645.5 m3) or fraction thereof <br /> <br />Other Fees: <br /> <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour) .............................................................. $75.75 per hour* <br /> <br />*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include <br />supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.