Laserfiche WebLink
<br />1997 UNIFORM BUILDING CODE, VOLUME 1 <br /> <br />TABLE A-33-A-GRADING PLAN REVIEW FEES <br /> <br />I <br />I <br /> <br />50 cu bic yards (38.2 m3) or less . . . . . . . . . . . . . . · . . . . . . . . . . . · . . . . . . . . . . . . · . . . . · · . . . . . . . . . . . . . · · . . · · . No fee <br />51 to 100 cubic yards (40 m3 to 76.5 m3) .... .... ........... ..... ... ............ ........ ..... ...... $23.50 <br />101 to 1.000 cubic yards (772m3 to 764.6 m3) ....... ... ................ ............. ....... ........ 37.00 <br />1.001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49.25 <br />10.001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3)-$4925 for the fast 10,000 cubic yards (7645.5 m3), plus $24.50 for <br />each additional 10,000 yards (7645.5 m3) or fraction thereof. <br />100.001 to 200,000 cubic yards (76456 m3 to 152911 m3)-$269.75 for the first 100,000 cubic yards (76 455 m3), plus $13.25 <br />for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. <br />200.001 cubic yards (152 912 m3) or more-$40225 for the first 200,000 cubic yards (152 911 m3). plus $725 for each addi- <br />tional10,000 cubic yards (7645.5 m3) or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans ............... $50.50 per hour* <br />(minimum charge-one-half hour) <br /> <br />"Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, <br />hourly \vages and fringe benefits of the employees involved. <br /> <br />I <br /> <br />TABLE A-33-8-GRADING PERMIT FEES' <br /> <br />I <br /> <br />50 cubic yards (38.2 m3) or less . . . . . . . . . . . . . . · . . . . · · . . . . . . . · . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . · . . . . · . $23.50 I <br />51 to 100 cubic yards (40 m3 to 76.5 m3) ... ............. ........................ ...... ..... .... .... 37.00 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3r-S37.00 for the fIrSt 100 cubic yards (76.5 m3) plus $17.50 for each additional <br /> 100 cubic yards (76.5 m3) or fraction thereof. <br />1.001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3)-$194.S0 for the fIrst 1:000 cubic yards (764.6 m3), plus $14.50 for each <br /> additional 1,000 cubic yards (764.6 m3) or fraction thereof. <br />10.001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3)-$325.00 for the fIrst 10,000 cubic yards (7645.5 m3), plus $66.00 for <br /> each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. <br />100.001 cubic yards (76456 m3) ormore-$919.00 for the first 100,000cubic yards (76455 m3), plus S36.50 for each addition- <br /> allO,OOO cubic yards (7645.5 m3) or fraction thereof. <br />Other Inspections and Fees: <br />1. Inspections outside of normal business <br /> h 0 u rs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.50 per hour2 <br /> (minimum charge-two hours) <br />2. Reinspection fees assessed under provisions of <br /> Section 108.8 ............ ........... ........ ..... ............ .... ............ ..... S50.50 per hour2 <br />3. Inspections for which no fee is specifically <br /> indicated .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.50 per hour2 <br /> (tp.i:1imum charge-one-half hour) <br /> <br />lThe:ft-.e{.ar a grading permit authorizing additional \vork to that under a valid permit shall be the difference benveen the fee paid <br />fOf me original permit and the fee shown for the entire project. <br /> <br />20r the total hourly cost to the jurisdiction, \vhichever is the greatest. This cost shall include supervision~ overhead, equipment, <br />houriy wages and fringe benefits of the employees involved. <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br />. <br />