Laserfiche WebLink
<br />.. <br /> <br />EXHIBIT B <br /> <br />LANDFILL, GRADING AND EXCAVATING PERMIT FEES <br /> <br />GRADING FEES <br /> <br />General. Fees shall be assessed in accordance with the provisions of this section or <br />shall be as set forth in the fee schedule adopted by the jurisdiction. <br /> <br />Plan Review Fees. When a plan or other data are required to be submitted, a plan <br />review fee shall be paid at the time of submitting plans and specifications for review. Said <br />plan review fee shall be set forth in Table A33-A. Separate plan review fees shall apply to <br />retaining walls or major drainage structures as required elsewhere in this code. For <br />excavation and fill on the same site the fee shall be based on the volume of excavation or <br />fill, whichever is greater. <br /> <br />Grading Permit Fees. A fee for each grading permit shall be paid to the building official as <br />set forth in Table A33-B. Separate permits and fees shall apply to retaining walls or major <br />drainage structures as required elsewhere in this code. There shall be no separate charge <br />for standard terrace drains and similar facilities. <br /> <br />TABLE A33-A GRADING PLAN REVIEW FEES <br />50 cubic yards (38.2 m3) or less ...................................................... No Fee <br />51 to 100 cubic yards (40 m3 to 76.5 m3) ....................................... $23.50 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) ............................. $37.00 <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) .................... $49.25 <br />10,001 to 100,000 cubic yards (7646.3 to 7645.5 m3) - $49.25 for the first <br />10,000 cubic yards (7645.5 m3), plus $24.50 for each additional <br />10,000 cubic yards (7645.5 m3) or fraction thereof. <br />100,001 to 200,000 cubic yards (7645.6 m3 to 15291.1 m3) - $269.75 for the <br />first 100,000 cubic yards (7645.5 m3), plus $13.25 for each additional <br />10,000 cubic yards (7645.5 m3) or fraction thereof <br />200,001 cubic yards (15291.2 m3) or more - $402.25 for the first $200,000 cubic <br />yards (15291.1 m3) plus $7.25 for each additional 10,000 cubic yards <br />(7645.5 m3) or fraction thereof <br /> <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-halfhour) $50.50 per hour* <br /> <br />* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall <br />include supervision, overhead, equipment, hourly wages and fringe benefits of the <br />employees involved. <br />