Laserfiche WebLink
<br />Oct 16 2002 9:00AM <br /> <br />BOHESTROO ROSENE ANDERLIK 6516361311 <br /> <br />Trunk Costs (oversizing) <br /> <br />Phase 1 <br /> <br />Pipe: <br />Valves: <br />Fittings: <br />Restraint: <br /> <br />p.2 <br /> <br />Sanitary'sewer from Centerville Road to Mallard Way was 12" PVC, <br />exclusively for grade r~asons4 Therefore not a trunk facility. <br /> <br />12" PVC watcnnain vs. 6tt PVC. <br />Low bidder had S23/LF for each. <br />2nd and 3M bidder differed b). $5 and $6.33 respectively. <br />Average is $5.661LF <br /> <br />Calculation: <br /> <br />3223' x $5.66/LF = <br />5 ea x $735.00/ea = <br />6,000# x O.85Ilb. = <br />48 ea x $lS.00/ea = <br />Subtotal <br />lndirect Costs (28.61 % ) <br />Total Tnlnk Cost <br /> <br />$18.242.18 <br />$3,675.00 <br />$5,100.00 <br />S720.oo <br />$27,737.18 <br />$7.935.61 <br />$3S,672.79 <br /> <br /><. <br /> <br /> <br />. . i .: <;;,,:" ". : i.!..;:.; .:i:'.. ~.,...~: .~'. "::"~ ',:::' ,I ..:;' <br />