Laserfiche WebLink
<br />Oc~ 02 2002 11:35AM BONESTROO ROSENE ANDERLIK 6518361311 <br /> <br />p.3 <br /> <br />CENTERVILLE <br />CSAH 14 Water Main Assessments <br />616-01-123 <br />Octobe.r 2, 2002 <br /> <br />TOTAL PROJECT COSTS: <br /> <br />$197,819 <br /> <br />City Costs (Trunk): 12- HOPE VB. 6" PVC <br />2700 IF x ($39.00 -$28.00) <br />Gate Valves: 12" GV VB 6- GV <br />2 sa x ($2,300,00 - $1,500.00) <br /> <br />Reconstruct ~'anhole at Waterworks: <br />0.36 x $10,000 <br /> <br />I ndirect Costs (200~) <br />TOTAL CITY COST: <br /> <br />TOTAL ASSESSABLE COST: <br />$197,619 - 41.760 <br /> <br />Opt~on1 : <br /> <br />Option 2: <br /> <br />Option 3: <br /> <br />Option 4: <br /> <br />$29,700 <br />1.600 <br />$31,300 <br /> <br />SubTotal <br /> <br />Sub Total <br /> <br />$3.500 <br />$34,800 <br />S6.960 <br />$41,760 <br /> <br />$156,859 <br /> <br />POSSIBLE ASSE~SMENT OPTIONS <br /> <br />Developer: 500/0 $77.929.50 <br />Remainder $77 ,929.50/18 u,nlts $4.329 sa <br />Rich Defoe: 8)( $4.329 $34,635 <br />Developer 10 units, Defoe B units <br />$155,859/28 units $6,566 ea <br />Developer: 10 x $5,566 $55.864 <br />Rich Defoe: 8)( $5,566 $44,531 <br />Waterworks Flat Fee $25,000 <br />$155,859 - $25,000 $'30,859 <br />$130.859/28 units $4.673 ea <br />Developer: 10 x $4,673 $46,735 <br />Rich Defoe: e x $4,673 $37,388 ($62.388 Total) <br />Waterworks Flat Fee $20,000 <br />$155,859 - $20,000 $135,859 <br />$135.000128 units $4,852 ea <br />Developer: 10 x $4,852 $48,520 <br />Rich D8f08~ 8 x $4.852 $38.817 ($58,817 Total) <br />