Laserfiche WebLink
<br />Oct 02 2002 11:35AH BONESTROO ROSENE ANDE~LIK 6516361311 <br /> <br />1=.3 <br /> <br />CENTERVILLE <br />CSAH 14 Water Main Assessments <br />818-01-123 <br />Octobe.r 2, 2002 <br /> <br />TOTAL PROJECT COSTS: <br /> <br />$197,619' <br /> <br />City Costs (Trunk): 121t HOPE vs. 6" PVC <br />2700 LF x ($39.00 - $28.00) <br />Gate Valves: 12ft GV VS 6- GV <br />2 sa x ($2,300.00 - $1,5oo.00). <br /> <br />$29,700 <br /> <br />1 ,SOD <br />$31 ;300 <br /> <br />Sub Total <br /> <br />Reconstruct~tanhole at Waterworks: <br />0.35 x $10tOOO <br /> <br />Sub Total <br /> <br />$3.500 <br />$34,800 <br />$6.960 <br />$41.760 <br /> <br />I ndirect Costs (2 QOA,) <br />TOTAL CITY COST: <br /> <br />TOTAL ASSESSABLE COST: <br />$197J619 - 41,760 <br /> <br />Opt~on' : <br /> <br />Option 2: <br /> <br />Option 3: <br /> <br />Option 4: <br /> <br />$1551859 <br /> <br />POSSIBLE ASSESSMENT OPTIONS <br /> <br />Developer: 500/0 S77, 929. 50 <br />Remainder $77,929.50/"18u,nits $41329 sa ." <br />Rich Defoe: B x .$4,329 $34,635 <br />DeveJoper 10 units, Defoe 8 units <br />S155,859/28 units $5,566 ea <br />Developer: 10 x $5.566 $55.664 <br />Rich Defoe: 8 x $5,566 $44.531 <br />Watervvorks Flat Fee $25,000 <br />$155,859 - $25,000 $' 30,859 <br />$130,859/28 units $4,873 ea <br />Developer: 1 0 x $i~)673 $46.735 <br />Rich Defoe: 8 x $4.673 $37,388 ($62,388 Total) <br />Waterworks Flat Fee $20,000 <br />$t55,859 - $20,000 $135,859 <br />$135)OOOJ28 units $4,852 ea <br />Developer: 10 x $4,852 $48,520 <br />Rich De108= 8 x $4,852 $38,817 '($58,817 Total) <br />