My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-21 CC WS Approved
Centerville
>
City Council
>
Minutes
>
2000-2009
>
2008
>
2008-05-21 CC WS Approved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2008 11:14:10 AM
Creation date
7/22/2008 11:13:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Centerville <br />City Council Work Session <br />May 21, 2008 <br />Councilmember Lakso stated that if we are looking at taking costs down, we should keep the <br />ones in that connect. She stated that the whole portion of Centerville Road does need to be done. <br />She added that she is fine with taking Mill Road out of the project. <br />Mayor Capra inquired as to what was the point of the full reconstruct on this portion. <br />City Engineer Statz replied that if you put curb on both sides of the road, you have to do a full <br />reconstruct. He confirmed that part of Mill Road is pulled out of both Option 1 and Option 2, as <br />people said they did not want it. <br />City Engineer Statz stated that the cost for the trail on Mill Road is $40,000. <br />Councilmember Paar suggested that, on one option, they figure no trails or sidewalks to see what <br />the costs are. <br />Councilmember Lee suggested leaving out Robin Lane and Center Street and doing the rest. He <br />stated that Center Street would be either Option 2 or delayed to 2014. Peltier should be done as <br />water is needed. He added that they might return to Mound, Lavelle and Center as an Option, <br />and that they should keep the C1's. <br />City Engineer Statz questioned whether the Council members would support the project if C1 <br />were part of the alternative. <br />Councilmember Lee stated that he was just trying to keep it simple. <br />Councilmember Broussard-Vickers added that she would like to see different options. <br />City Engineer Statz replied that if you bid these and decide not to do them, you would risk <br />$50,000 in engineering fees. The rest of C1 improvements would lose $75,000 in engineering <br />fees. <br />Councilmember Broussard-Vickers stated that based on $125,000 in fees, we should either put it <br />all in or leave it all out. <br />Mayor Capra stated that they have done change orders before. <br />Councilmember Lee suggested that if doing Fox Run, why not do the surrounding roads. <br />Councilmember Paar requested Public Works Director Palzar's opinion regarding what he has <br />heard them describe. <br />Public Works Director Palzar replied that Peltier Drive could reduce the sand amount on the high <br />area. He stated that possibly to save money, the City Engineer could look at that. He stated that <br />Center Street was never properly graded, and that it definitely could use a full reconstruct. He <br />added that a full reconstruct would be extending the life of the roads around there. He suggested <br />that annual inspections could help the City Council make future decisions. <br />Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.