My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-23 CC Agenda & Work Session
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2008
>
2008-07-23 CC Agenda & Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2008 9:34:12 AM
Creation date
7/23/2008 9:33:26 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~. <br /> <br />~ 93.20 PERMIT FEES. <br /> <br />(A) Excavation permit fie. The city shall establish an excavation permit fee in the amount <br />sufficient to recover the following costs: <br /> <br />(1) The city management costs; and <br /> <br />(2) Degradation costs, if applicable. <br /> <br />(B) Obstruction permit fee. The city shall establish the obstruction permit fee, which shall be in <br />an amount sufficient to recover the city management costs. <br /> <br />(C) Payment of permit fees. No excavation permit or obstruction permit shall be issued without <br />payment of excavation or obstruction permit fees. <br /> <br />(D) Nonrefundable. Permit fees that were paid for a permit that the city has revoked for a breach <br />as stated in ~ 93.27 are not refundable. <br /> <br />(E) Application to franchises. Unless otherwise agreed to in the franchise, management costs may <br />he charged separately from and in addition to the franchise fees imposed on a right-of-way user in the <br />franchise. <br /> <br />(F) Establishment. All permit fees shall be established by resolution of the City Council. <br />(Ord. 74, passed 11-27-2002) <br /> <br />~ 93.21 PATCHING AND RESTORATION. <br /> <br />(A) Timing. The work to be done under the excavation permit, and the patching and restoration of <br />the right-of-way as required herein, must be completed within the dates specified in the permit. <br /> <br />(B) Patch and restoration. The city may choose either to have the permittee restore the right-of- <br />way or to restore the right-of-way itself. <br /> <br />(1) City restoration. If the city restores the right-of-way, permittee shall pay the costs thereof <br />within 30 days of billing. If, following the restoration, the pavement settles due to permittee's <br />improper backfilling, the permittee shall pay to the city, within 30 days of billing, all costs associated <br />with having to correct the defective work. <br /> <br />(2) Permittee restoration. If the permittee restores the right-of-way itself, it shall at the time <br />of application for an excavation permit post a construction performance bond in accordance with the <br />provisions of Minn. Rules 7819.3000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.