My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2008
>
2008-08-06 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2008 2:10:14 PM
Creation date
7/31/2008 3:44:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 of3 <br /> <br />4. There needs to be additional planti.ngs in the rain garden to replace the failed ones. <br /> <br />About 2 weeks ago or so, our landscape architects met with the contractor to review the plantings and other <br />issues with the rain garden. Yesterdqy, we submitted a revised planting plan to Gregg Thompson for his <br />review. Once we get comments back from Gregg, we will let you gtgs take a look and then we'll get the <br />replacements done. <br /> <br />5. The center post on the western-most bench, near the checker board, is too high making <br />the bench appear bowed. <br /> <br />I'll look at this again. I know thry jixed a few of these benches with the same problem. Perhaps thry missed <br />this one. <br /> <br />6. The sliding bench on the north needs the slats replaced to match the recycled material of <br />the rest of the benches. <br /> <br />Several months ago, I sent a jinal email to the supplier of the slats giving them the go-ahead to order the <br />reryded slats. Earlier this Jveek, I sent another email and lift a voice mail asking where our order was. I <br />have not yet heard back. I will follow up on this. <br /> <br />7. The replacement planti.ngs on the beach (not the shoreline restoration part) are not in. <br /> <br />W7hen the plantings were reviewed in the rain garden, the rest of the plantings in the park were also reviewed. <br />We have documented those which need replacement. All replacements (rain garden and others) will be done at <br />the same time. <br /> <br />8. The drinking fountain is not level. I've asked our inspector to look at this. It was level earlier this <br />spting when I was at the park. I wzJl get back to you when Jve jigtlre out what happened here. <br /> <br />9. The drinking fountain does not have the lower "dog bowl" spout. I think we opted NOT to <br />have the dog bowl feature. Perhaps you are rifening to the hose connection at the bottom. I was under the <br />understanding that we had installed the proper connection and that it was acceptable to the public works <br />department. I Jvill speak with Paul to make sure what we have is at:eeptable. <br /> <br />10. The sub-contracted shoreline restoration has not begun. It's my understanding that Gregg has <br />been in touch with the contractor and that supplies have been ordered Thry are also working through the <br />process to get access from the St. Paul Water Utility site to minimize damage to the park from constmetion. I <br />believe constmction will begin within a week or two, once supplies have eome in. You could contact Greggfor <br />more information on the schedule. <br /> <br />All of these items were on our previous list of items that needed to be fInished. With the <br />exception of the shoreline restoration, I expected these items to be completed earlier this <br />spnng. <br /> <br />7/31/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.