My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-05 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2025
>
2008
>
2008-08-05 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2008 8:15:07 AM
Creation date
8/5/2008 8:13:23 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />necessary or desirable to provide a service or a facility which is in the interest of the <br />public convenience and will contribute to the general welfare of the neighborhood or city~ <br /> <br />(b) That the proposed building or use will not have a substantial or undue <br />adverse effect upon adiacent property, the character of the neighborhood. traffic <br />conditions, utility facilities and other matters affecting the public health, safety and <br />general welfare~ <br /> <br />(c) That the proposed building or use will be designed, aITanged and <br />operated so as to permit the development and use of neighboring property in accordance <br />with the applicable district regu]ations~ and <br /> <br />(d) That the scope or duration of the proposed use is of a limited nature <br />which would not otherwise run with the land: <br /> <br />( e) That the scope or duration of the proposed use ]s subiect to clearly <br />defined and stated limitations. <br /> <br />(3) The city may attach conditions to approval of a permit to mItIgate <br />anticipated adverse impacts associated with the use, to ensure compliance with the <br />standards of approvaL to protect the value of other property, and to achieve the goals and <br />obiectives of the comprehensive plan. <br /> <br />(D) Procedure. <br /> <br />(I) An application for a Interim Use Permit shall be submitted in triplicate to <br />the Zoning Administrator. The Planninf-': Commission or the Council may require any <br />additional information they deem necessary before a hearing is held. In the Flood Plain <br />Districts. the application shall also follow the requirements of Chapter 155, Flood <br />Damage Prevention. <br /> <br />(2) A public hearinf-': shall be set. noticed and conducted by the Planning <br />Commission in accordance with this Chapter. The Commissioner of Natural Resources <br />shall be given at least ten davs' notice of hearing of all applications for conditional uses <br />in the Flood Plain Districts. <br /> <br />(3) Within 30 days after the conclusion of the public hearing. the Planninf-': <br />Commission shall transmit to the Council a written report containing its <br />recommendations concerning the proposed interim use. Such report shall be <br />accompanied bv findings of fact specifying the reasons for the recommendation. In <br />considerinf-': interim use applications in the Flood Plain Districts. the Planninf-': <br />Commission shall consider all requirements of this Chapter together with Chapter 155, <br />Flood Damage Prevention. <br /> <br />(4) The Council shalL within 30 days of the receipt of the report of the Planninf-': <br />Commission, f-':rant or deny the interim use or refer the matter back to the Planninf-': <br /> <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.