<br />.
<br />
<br />Page 2 of 3
<br />
<br />From: Statz, Mark R
<br />Sent: Friday, September 21,20072:40 PM
<br />To: 'Gregg Thompson'
<br />Cc: McDowell, Jeff J; Smyth, John R; 'dlarson@centervillemn.com'
<br />Subject: RE: Centerville Park - raingarden & shoreland stabilization / buffer
<br />
<br />Gregg,
<br />
<br />Thanks a lot for the evaluation. The council and parks folks are going to meet on site at 6:00 on Wednesday the
<br />26th. We would love to have you there if you could make it. If you want to bring your power point, we could
<br />view it at the council meeting afterwards (7:00).
<br />
<br />A couple of things I could clarify for you:
<br />
<br />. Side slopes of the rain garden were only recently planted and haven't had much of a chance to fill in. We
<br />do, however, plan to add some more plantings to areas without plants.
<br />. The rain garden has been draining in sufficient time since we modified the drain tile outlet. Originally, the
<br />draintile ran into the outlet structure. The invert of the outlet structure, however, was higher than the
<br />draintile violating the old rule that water does not run uphill. Since we bypassed the outlet structure and
<br />took the draintile into the swale to outlet, the garden has drained properly. It was during this time that the
<br />rain garden drain tile was not functioning, that most of our plants died. We plan to replace those plants
<br />(some in kind because we think they will survive now that the rain garden is functioning properly and others
<br />we will replace with more hearty species such as those which have made it despite the prolonged
<br />inundation).
<br />. The floating silt curtain has never been meant to be a wave breaker and has caused us a lot of headaches.
<br />It's there as part of our temporary erosion control plan. We will be removing it soon.
<br />
<br />Thanks again. We will run some of your suggestions past the council and parks board to see if they would like to
<br />install those items.
<br />
<br />Mark Statz, PE
<br />Associate
<br />Tel 651-604-4709
<br />Cell 651-775-5126
<br />mark.statz@bonestroo.com
<br />
<br />.. Bonestroo
<br />
<br />"'"...,__......-."-.,.-...,.......,....,."~""""_,___.~...,...,'''''''''.,,......,.,.....,,.,.-,_.-,_--,...~,_''"<<.......,.,..,.,.,.,....,...,.......,...."'^''''.,_..,w:.".....__".^'""'_y.._.,~._,._,.'.......,."...4.,,.,..""_~..__,.,._,...,,".'.,~~._~"""""""_"___.",._'.......,_._"'_..,,,._"_,,_'...,_,,_______'''__,--,,._~',....__'.:._"',."''''__,._.__._,_'':,,._.,._''''........,.~.,.....~''_w
<br />
<br />From: Gregg Thompson [mailto:metroswcd@isd.net]
<br />Sent: Friday, September 21,20072:17 PM
<br />To: Statz, Mark R
<br />Cc: Thompson, Gregg
<br />Subject: Centerville Park - raingarden & shoreland stabilization / buffer
<br />
<br />Mark,
<br />
<br />Thanks for the call.
<br />
<br />I had gotten a chance to go out to this park on Centerville Lake last Friday (9/14), along with my co-worker Shawn Tracy.
<br />
<br />9/25/2007
<br />
|