My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-27 CC Meeting Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-08-27 CC Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2008 3:12:56 PM
Creation date
8/22/2008 3:12:38 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,- <br /> <br />......."....... <br />...,.;~:~}--- <br /> <br />GREAT RIVER <br />ENE R G y3 <br /> <br />12300 Elm Creek Boulevard · Maple Grove, Minnesota 55369-4718 . 763-445-5000 . Fax 763-445~5050 . \V\v\V.GreatRiverEnerg~'.com <br /> <br />August 19, 2008 <br /> <br />Easement # CH-AQ-49 <br /> <br />Craig Ankrum <br />7317 Brian Drive <br />Centerville, MN 55038 <br /> <br />SUBJECT: Shed encroachment into the transmission line easement <br /> <br />Dear Mr. Ankrum: <br /> <br />Great River Energy is the owner of the transmission line running along your property line. <br />You have requested a building encroachment into Great River Energy's easement area. <br />After a review of the current line design and the easement area, Great River Energy will <br />allow you to construct your shed as shown on Exhibit A herewith. The shed may not <br />encroach any closer than 25 feet from the outer most conductor (wire) on the transmission <br />line. Please be advised that if for any reason Great River Energy requires that the shed be <br />moved out of the easement area, you will do so at your own loss and expense. <br /> <br />As a reminder, Great River Energy's facilities are overhead, so they will not show up in your <br />Gopher One-Call locates. Use great caution when working near or transmission line, this <br />line carries 69,000 volts of electricity and has the capability of arcing if objects come too <br />close to the line. You are required to maintain all clearances by OSHA regulations and <br />National Electric Safety Code (NESC) any time while working near any power line. Please <br />be advised that Great River Energy does not assume any liability, which might arise out of <br />construction in its right-of-way. <br /> <br />If you have any questions, please contact me at 763-445-5984. Thank you. <br /> <br />Sincerely, <br /> <br />GREAT RIVER ENERGY J dJ <br /> <br />A~.~~;J/P'~ <br /> <br />Michelle MacMillan <br />Land Rights Technician <br /> <br />c: Rick Chase - City of Centerville <br /> <br />Enclosure <br /> <br />MM:ve\R:\ALL- ENCROACHMENTS & CLEARANCE VIOLATfONS\CH\CH-AQ-49.doc <br /> <br />. Direct Dial (763) 445-5984 B-Mail rrunacmillan@J!:renerRy'.com FAX (763) 445-6784 <br />A Touchstone Energy" Cooperative ~~ 0 Contains 100% post consumer waste <br />- <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.