My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-27 CC - Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-08-27 CC - Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2008 8:49:43 AM
Creation date
8/28/2008 8:49:29 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AJ ROSS CONCRETE AND MASONRY <br /> <br />CENTERVILLE ROOFING REPAIRS <br /> <br />LOCA TION# <br /> <br />/1 <br /> <br />ROOF PITCH <br /> <br /> <br />SHINGLE <br /> <br />TiM-wI, ~ <br />, . <br /> <br />SHINGLE MFG <br /> <br />aA=F <br /> <br />COLOR <br /> <br />n:at,:ll <br /> <br /> <br />v ""'protect bushes and shrubs from debris <br />fit" Remove existing roof materials. Re- ail se boards <br />o Install new sheetin& extra cost. . . V er sheet. Not included in price below <br />o /Roof board replacement is er ft. Not included in cost below <br />.r /Install ice and water barrier on roof eaves, valleys, and roof penetrations (per city code) <br />v'/Apply 15 lb. tar paper over remain' portion of roof deck <br />~Ie roof edge on gable edg <br />o eplace soil-stack covers. Replace roof vents Painted <br />r starter on bottom edge <br />~ Afalvanized pre-formed "w" valley <br />\Y"" Aoof nails will be used to fasten shingles per manufacturers specification <br />~ Shingle entire roof area complete with ridge caP. caulk as needed <br />o Replace dormer flashing <br />~ePlace furnace pipe accessories <br />o Install new metal flashing in chimney <br />~ ./Remove all roof debris from job site. Magnetic sweep included <br />~ AJ ROSS Concrete and Masonry guarantees roof for 7 years against leaks except for building structure changes or severe <br />~ather, etc. <br />~ ~ufacturer warranties shingles for ~ears. <br />y-- Additional . <br />comments Q..t.... '^ <br />A <br /> <br /> <br />Building permits and all sales tax included in total cost of the job. <br /> <br />Payment <br /> <br />In consideration for the services to be performed cy the contractor, client agrees to pay the sum of ($ <br /> <br />~ 71-vW)....ul_.R.')~+ ~./u'5 <br /> <br />L{f~lJ. at) <br /> <br />Dollars <br /> <br />~ {lNNr <br />
The URL can be used to link to this page
Your browser does not support the video tag.