Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. ICem Unit Quantity Price Quantity to Date to Date <br /> PART t: BASE BID B - PEDESTAL SPHEROID CONSTRucnON: <br />1 DESIGN DRAWINGS LS 1 25000 .00 1 1 $25,000.00 <br />2 FOUNDATION La 1 21000000 1 1 $210,000.00 <br />3 STEEl FABRICATED TO SITE La "1 235895 .00 1 1 $235,895.00 <br />4 FIELD ERECTION LS 1 138000.00 1 1 $138,000.00 <br />5 FIELD PAINTING LS 1 190000..00 1 1 $190.000.00 <br />6 FIELD ELECTRICAL LS 1 30000.00 1 1 $30,000.00 <br />7 CATHODIC PROTECTION La 1 8300.00 1 1 $8.300.00 <br /> TOTAL PART 1: BASE BID B - PEDESTAL SPHEROID CONSTRUCTION: $837,195.00 <br /> PART 2: FOUNDATION P1UNG - BASE BID B - PEDESTAL SPHEROID PlUNG: <br />8 9 - 518" DIA CAST-rN-PLACE CONCRETE TEST PILE EA 2 1600.00 2 2 $3.200.00 <br />9 9 - 518- D1A CAST-IN-PLACE CONCRETE PILING, DRIVEt LF 2080 1700 2061 2061 $35,037.00 <br /> TOTAL PART 2: FOUNDATION PILING. BASE BID B - PEDESTAL SPHEROID PILING: $38,237.00 <br /> PART 3. SITE WORK: <br />10 SALVAGE AND REINSTALL CHAIN LINK FENCE lF 24 29.15 24 24 $699 60 <br />11 SALVAGE. STOCKPILE, AND RESPREAO TOPSOil LS 1 10000 1 1 $10000 <br />12 REMOVE WATER MAIN LF 114 10.00 114 114 $1,14000 <br />13 REMOVE STREET SWEEPING MATERIAL CY 220 5.00 453 453 $2.265 .00 <br />14 SILT FENCE. REGUlAR LF 800 3.00 588 588 $1,764.00 <br />15 6' HIGH CHAIN LINK FENCE LF 135 18.45 $0.00 <br />16 20' WIDE DOUBLE SWING GATE EA 1 1030.00 $0-00 <br />17 TYPE 41 BITUMINOUS FOR DRIVEWAYS TN 40 40.00 SO.OO <br />18 TYPE 31 BITUMINOUS BASE COURSE TN 50 40.00 $0.00 <br />19 AGGREGATE BASE, CLASS 5, 100% CRUSHED TN 700 20.00 $0.00 <br />20 GEOTEXTILE FABRIC, TYPE V SY 360 2.00 $0.00 <br />21 CONNECT TO EXISTING WATER MAIN EA 2 50000 2 2 $1,000.00 <br />22 16" pVC WATER MAIN LF 270 45.00 286 286 $12,87000 <br />23 16"DIPWATER MAIN. ClASS 52., INCl. Pot.VWRAP lF 115 40.00 110 110 $4,400..00 <br />24 6" DIP WATER MAIN. CL 52. INCl. POL YWRAP LF 10 25.00 185 18.5 $462 .50 <br />25 6" GATE VALVE AND BOX EA 1 650 .00 2 2 $1,300.00 <br />26 12" GATE VALVE AND BOX EA 1 1500 .00 1 1 $1.500.00 <br />27 16"GATEVALVEAND BOX EA 1 4000 .00 1 1 $4,000.00 <br />28 CAST IRON FITTINGS LB 2065 2.00 3089 3089 $6,178.00 <br />29 INSTALL HYDRANT EA 1 1800.00 1 1 $1,800.00 <br />30 OVERFlOW MANHOlE SA 1 2500.00 1 1 $2,500.00 <br />31 15" RCP STORM SEWER IF 120 30.00 104 104 $3,120.00 <br />32 15" RCP FLARED END SecTION EA t 500.00 1 1 $500.00 <br />33 CLASS III R1PRAP. PLACED AT FLARED END SECTION CY 5 100.00 5 5 $500.00 <br />34 MNDOT SEED MIX 7M AC 02 5000.00 $0.00 <br />35 WOOD FIBER BLANKET SY 500 5.00 800 800 $4,000.00 <br /> TOTALPART3.srrEWOR~ $50,099 10 <br />CHANGE ORDER NO.1 <br />1 ELIMINATE TANK EXTERIOR IlLUMfNATION LS 1 -7500.00 ($7,500.00) <br />2 ELIMINATE TANK CONTAINMENT REQUIREMENTS LS 1 -48000 00 ($48.000.00) <br /> TOTAL CHANGE ORDER NO 1 ($55.500 .00) <br /> <br />TOTAL PART 1: BASE BID B - PEDESTAL SPHEROID CONSTRUCTION: <br />TOTAL PART 2: FOUNDATION PILING - BASE BID B - PEDESTAL SPHEROID PILING: <br />TOTAL PART 3. SITE WORK: <br />TOTAL CHANGE ORDER NO. 1 <br />TOTAL. WORK COMPLETED 10 DATE <br /> <br />$837,195,00 <br />$38.237.00 <br />$50,099. 10 <br />($55.500.00) <br />$870,031..10 <br /> <br />81603130Raq 12... <br /> <br />;-<)/Y <br />