My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-10-26 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-10-26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:38:18 PM
Creation date
10/28/2005 11:37:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JLlj Bonestroo <br />-=- Rosene <br />'I\lI Anderlik & <br />. \J. Associates <br />Engineers & Architects <br /> <br />Owner: City ofCentervilIe, 1880 Main St., CentervilIe, MN 55038 Date July 25, 2005 <br />Contractor: Telemetry Process Controls Inc., 5660 Memorial Ave. N., Stillwater, MN 55082 <br /> Bond No: <br />Bond Company: Granite Re Inc. ,14001 Quail Plaza Dr., Oklahoma City, OK 73134 GRMN23144A <br /> <br />CHANGE ORDER NO. 1 <br />SUPERVISORY CONTROL AND DATA ACQUISITION PROJECT <br />B-RAFILE NO. 000616-04136"-0 <br /> <br />Descriotion of Work <br />This Change Order provides for the Contractor to furnish and install a pressure transmitter for the new water tower. A <br />pressure transmitter measures the water system pressure and regulates the water level in the tower. The transmitter was not <br />included in the original contract documents for the water and was overlooked during the design of the SCADA system. <br /> <br /> Contract Unit Total <br />No. Item Unit Quantity Price Amount <br /> CHANGE ORDER NO.1 <br /> FURNISH AND INSTALL PRESSURE LS $2,355.00 $2,355.00 <br /> TRANSMITTER AT THE NEW TOWER <br /> TOTAL CHANGE ORDER NO.1: $2,355.00 <br /> <br />;~" <br /> <br />6 I 604 136CHO1.xJs <br /> <br />d\) <br />
The URL can be used to link to this page
Your browser does not support the video tag.