My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-05 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2008
>
2008-11-05 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2008 3:44:15 PM
Creation date
11/3/2008 3:43:40 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Parks & Recreation Committee <br />Meeting Minutes 10-01-08 <br /> <br />Committee Meeting Agenda. <br /> <br />Message Board at Tracie McBride Memorial Park <br /> <br />The committee asked at the last meeting when would the message board be installed in place of the faux <br />window. Mr. Palzer had said there was a message board available at City Hall which could be installed at <br />Tracie McBride Memorial Park, but he was mistaken, there is not a board available. Ms. Stephan informed <br />the committee that if this is something the committee would still like to do they would need a motion to <br />have staff purchase one. Also to please consider who would be keeping this board updated and what type <br />of information would be posted. No action was taken at this time. <br /> <br />Ms. Stephan also asked the committee to consider who would be responsible for an additional flowerbed <br />installed around the Tracie McBride Memorial Park building as discussed at the last committee meeting. <br />We have one resident volunteer who has adopted the flowerbed at this park, the rest of the parks (5) are <br />being done by staff, as time permits. Another flowerbed would probably not fit into staff time. <br /> <br />Dead Broke Saddle Club/Climbing Wall <br /> <br />The Dead Broke Saddle Club met Tuesday, September 23, 2008 and discussed the donation to Parks & <br />Recreation for the climbing wall and has donated $6,000 for this purpose. This information will be passed <br />on to Public Works and Mr. Larson to order the equipment. <br /> <br />Hidden SPrint!: Park <br /> <br />Ms. Stephan passed on the following update submitted by Mark Statz, City Engineer, via email 09-02-08 <br />from Viet, the Hidden Spring contractor. <br /> <br />Veit has replaced the hose-bib connection on the fountain again. We also straighten the fountain and <br />talking with the fountain supplier they recommend a concrete pad poured around to help stabilize. If you <br />want us to provide one please send a design. <br /> <br />Regarding the damage to some asphalt areas, Veit is not responsible for these damages. We were <br />substantially complete prior to Centerville's Centennial celebration in the park and the damage was <br />discovered after that. There were numerous trailers and heavy activities during that festival. The <br />damage occurred during that time frame, not during construction. <br /> <br />Once the raingarden plant replacement is finished, Veil will consider this project 100% complete and no <br />other punch list items remaining. We will request full retainage released at that time. Thank you and if <br />you have any questions let me know. Jesse Roush, Project Manager/Estimator <br /> <br />Ms. Stephan discussed this with Mr. Tedd Peterson, Public Works who was adamant the damage was done <br />by Veit and has nothing to do with the 'Centennial Celebration' and pointed this out to the contractor at the <br />site as it was done. He also pointed it out to Bonestroo, multiple times. This information was forwarded <br />again to Bonestroo and Veit then responded with Quality Restoration was out to fix the black top. Mr. <br />Peterson has also asked that the Comeast cable hanging from the post at Hidden Spring Park be buried as <br />it has been cut multiple times, not to mention it looks bad and is a Safety hazard. He has talked to <br />Comcast and to Chris Long at Bonestroo and it is still not buried. Ms. Stephan passed this information on <br />to Bonestroo, the Public Works Director and City Administrator. <br /> <br />40f6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.