Laserfiche WebLink
<br />DRAFT <br /> <br />12/5/2008 <br />EXHmIT D <br /> <br />ELECTRICAL FEES <br /> <br />Individual/separate inspection (installation, replacement, alteration or repair)...... .................................... $35.00 <br /> <br />Services, generators, feeders to separate structures and other power supply resources: <br /> <br />1. 0 ampere to and including 200 ampere capacity............................................................. $35.00 <br />2. Each additional 100 amps or fraction thereof...................................................an add'l $10.00 <br />3. For services and circuits operating at over 250 volts .....................(Scheduled fee doubles) <br /> <br />Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br /> <br />1. 0 ampere to and including 30 ampere capacity.................................................................$8.00 <br />2. 31 amps to 100 amps ......................................................................................................$10.00 ea. <br />3. Each additional 100 amps ................................................................................... an add'l $5.00 <br /> <br />One-Family dwelling and each dwelling unit of a two-family dwelling ................................................... $150.00 <br />Up to and including 200 amps service (includes not more than three inspections) <br /> <br />Multifamily dwellings........................................................................................................................... ...... $80.00 <br /> <br />Electrical supply for each manufactured home park lot .............................................................................. $40.00 <br /> <br />Recreational vehicle site, electrical supply equipment................................................................................$1O.00 ea. <br /> <br />Street, parking lot or outdoor area lighting standards ................................................................................... $5.00 <br /> <br />Transformers for light, heat and power: <br />1. Up to and including 10 kilo-volt amps ...........................................................................$20.00 ea. <br />2. Over 10 kilo-volt amps ................................................................................................... $40.00 ea. <br /> <br />Transformers and electronic power supplies for electric signs and outline lighting .....................................$7.50 <br /> <br />Alarm, communication, remote control and signaling circuits or systems and circuits of less <br /> <br />than 50 volts .......................................................................................................................................... $1.00 ea. <br /> <br />... .... .................. .... ...... ......... ........ ............. ...... ........... ... ...... ........... ........ ... Minimum fee $35.00 <br /> <br />Swimming pool bonding inspection (each separate inspection).................................................................. $25.00 <br />(Bonding conductors and connections require an inspection before being concealed) <br /> <br />Retrofit modifications to existing lighting fixtures ......................................................................................... $AO/fixture <br /> <br />Electrical work commenced without filing the required permit.................................................................. $75.00 <br />or double the calculated <br />fee, whichever is greater <br /> <br />Re-Inspection fee (when inspection is necessary to determine whether the unsafe conditions have been corrected a fee <br />may be assessed in writing by the inspector) of.......................................................................................... $35.00 <br /> <br />When inspections scheduled by the installer are pre-empted, obstructed, prevented or otherwise not able to be completed <br />as scheduled due to circumstances beyond the control of the inspector, a supplemental inspection fee may be assessed in <br />writing by the inspector of .......................................................................................................................... $35.00 <br /> <br />Transient Projects - Power supply fees as identified above, plus 1 hour.....................................................$80.00/hour <br />Exhibit D (con't) <br /> <br />Each attraction or concession inspection....... ............ ..... ....... .......... ........ ......... ......... ....................... ........... $35 .00 <br /> <br />Page 10 of 14 <br />