Laserfiche WebLink
<br />EXHffiIT B <br /> <br />LANDFILL, GRADING AND EXCAVATING PERMIT FEES (Cont'd) <br /> <br />GRADING PERMIT FEES* <br /> <br />50 cubic yards (38.2 m3) or less ................................................................. $37.01 <br />51 to 100 cubic yards (40 m3 to 76.5 m3)................................................... $58.28 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $58.28 for the first 100 cubic yards <br />(76.5 m3), plus $27.56 for each additional 100 cubic yards (76.5 m3) or fraction <br />thereof. <br />1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) - $306.34 for the first 1,000 <br />cubic yards (764.6 m3), plus $22.84 for each additional 1,000 cubic yards <br />(764.6 m3) or fraction thereof. <br />10,001 to 100,000 cubic yards (7,646.3 m3 to 7,645.5 m3) - $511.88 for the first 10,000 <br />cubic yards (7,645.5 m3), plus $103.95 for each additional 10,000 cubic yards <br />(7,645.5 m3) or fraction thereof. <br />100,001 cubic yards (7,645.6 m3) or more - $1,447.43 for the first 100,000 cubic yards <br />(7,645.5 m3), plus $57.49 for each additional 10,000 cubic yards (7,645.5 m3) <br />or fraction thereof. <br /> <br />Other Inspections and Fees: <br />1. Inspections outside of normal business hours.................................. $79.54 per hour <br />(minimum charge - two hours) <br />2. Reinspection fees assessed under provision of Section 108.8.......... $79.54 per hour <br />3. Inspections for which no fee is specifically indicated...................... $79.54 per hour <br />(minimum charge - one-half hour) <br /> <br />*The fee for a grading permit authorizing additional work to that under a valid permit shall be the <br />difference between the fee paid for the original permit and the fee shown for the entire project. <br /> <br />**Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include <br />supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. <br />