My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-28 Agenda Packet CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-01-28 Agenda Packet CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2009 8:59:46 AM
Creation date
1/26/2009 8:57:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />terviffe <br /> <br />CITY OF CENTERVILLE <br />MONTH! Y ENGINEER'S REPORT <br />For January 14, 2009 City Counel Meeting <br /> <br />tEsta6fisl;ed'1857 <br /> <br />Italics = New information. <br />Normal = No change from last report. <br /> <br />1. 21st Avenue/Backage Road (000616-05143-0). The project is complete and final payment has <br />been made. The RCWD is requiring some additional restoration work. before the Contractor is given <br />back their surety. The work will be completed in the Spring of 2009 when the ground is workable. <br /> <br />2. Old Mill Road Improvements (000616-06147-0). We are in the process of obtaining lien waivers <br />and IC-134's. Once all documents are received we will recommend Project Close Out and Acceptance. <br />The Contractor has contacted the City of Centerville to see if a joint check can be prepared for Final <br />Payment because the subcontractors will not release their lien waivers until they are paid for the work <br />they completed. <br /> <br />3. Clearwater Creek Estates (Hanzal Property) (000616-06154-0). Reseeding of the corrected <br />mitigation area has been completed. A skimmer structure is to be placed at the pond outlet per RCWD <br />requirements. Once the seeding is established and the skimmer structure is installed, we can finalize <br />the project and ask RCWD to release their permit surety. <br /> <br />4. Hidden Spring Park (000616-07155-0). Final Payment has been made to the Contractor. The <br />only items remaining are the replacement of the glider bench slats and the monitoring of the plantings <br />in the rain garden and upper shoreline area next spring. <br /> <br />5. Comprehensive Plan (000616-07157-0). We have sent the comprehensive plan to the Met <br />Counel for their formal review. Once the Met Counel approves it, the plan, with any noted revisions, <br />will go before P&Z for a hearing then to the City Council for final adoption. <br /> <br />6. 2009 Street and utility Improvements (000616-07158-0). Bids were received on October 291t1. <br />Assessment policies and other project issues have been discussed at the special City Coundl meetings <br />on November Sltl, December 1st, and January jh. <br /> <br />The tentative schedule for the project is as follows: <br /> <br />Assessment Hearing <br />Consider Award <br />Construction <br /> <br />January 21, 2009 <br />January 28 or Feb. 11, 2009 <br />Spring 2009 <br /> <br />7. CSAH 14 Construction Services (000616-07159-0). Construction is on hold until spring. <br /> <br />8. Downtown Redevelopment Comprehensive Infrastructure Plan (000616-07161-0). We <br />continue to provide support to Mr. Meyer and the Beard Group as they formulate an initial phase for the <br />redevelopment project. Pro-Source Technologies has completed soil borings in the downtown area toninvestigate possible contamination sites and to develop an action plan for dealing with them as the <br />redevelopment occurs. The results of those borings and a draft of the action plan will be presented to <br />Counel sometime this winter. <br /> <br />9. Creative Kids Day Care Site (000616-07164-0). The Contractor is still working on some drain tile <br />items that are being required by the RCWD that they have to correct. <br /> <br />10. TE Grant Trail Project (000616-08165-0). A draft of the Project Memorandum (Environmental <br />Document) will be available for aty staff review the week of the 1zn. We would also invite members of <br />the Parks and Rec. Committee to review the document since it involves major work on the City's trail <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.