My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-04 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2009
>
2009-03-04 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2009 2:41:11 PM
Creation date
2/20/2009 3:09:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Northeast Metro Trail Plan <br /> <br />June 3, 2003 <br />Centerville Park and Recreation, 651-429-3232, <br />Wayne LeBlanc, 651-426-0168 <br /> <br /> <br />Centerville, Lino Lakes, Hugo, Anoka Parks, Anoka County, Washington County, Ramsey County, and the <br />surrounding Metro area benefit from the trail plan in Figure I. The trails connect the Hugo trail that will <br />apparently go to Duluth to other trails connected to the Chain of Lakes Park and south to Otter Lake Park including <br />a future recreational park at Birch Street and Centerville Road. The trails in and around Centerville are designed to <br />pronwte safe pedestrian and bicycle routes to parks, commercial areas, other trails, homes, and places of interest. <br />In addition, 100 s in the desi enhance flexibility and a I. <br /> <br />,,\,. <br /> <br />.. ~ I~ <br />.'1 ! <br />-~--.,...... <br /> <br />. ~:~-- <br /> <br />N <br /> <br />The purpose of this plan is to <br />coordinate the participating <br />organizations. Please contact <br />Centerville or Wayne LeBlanc to <br />coordinate actions. <br /> <br />On Sep 25, 2000, people <br />representing Centerville, Hugo, <br />Lino Lakes, Anoka County Parks, St <br />Paul Water, and Washington County <br />Parks met and agreed to pursue this <br />plan. <br /> <br />14 <br /> <br />Considerations for particular areas <br />are identified with the large letters <br />and described below. <br /> <br />. <br />-" <br />~ <br />N-~l <br />II ~~ <br />10 <br />(;i.; . <br />,~liJ!;' <br />1 <br /> <br />Area A: HUl!o to Pedestrian <br />Bridl!e at 3SE <br />Hugo, Washington County, Lino <br />Lakes, and Anoka County plan to <br />coordinate the route of a trail from <br />the existing Hugo trail to a proposed <br />pedestrian bridge at Area B, where <br />35E and Clearwater Creek intersect. <br />With Hugo's planned reconstruction <br />of the road from Hugo to Area A in <br />the next couple years, the inclusion <br />of the trail follows naturally. The <br />urgencv here is to include the trail in forthcoming develooments. Hugo is also looking at providing an attractive <br />trail along Clearwater Creek and at least one development has already included it. <br /> <br /> <br />t__cii <br />::::::::-"'l~. "'" <br />~-A~ <br />..,~'" f" <br />~"",\,-(l!\ ~r-":'.q. Ii <br />~. =1 <br /> <br />j> ,3,; <br />, ~"",vmu.r I <br />~.",-" 3' .1<o\!II'~OO <br />~mJ'~ !, <br />:: ! ~ <br />"",'-".AIl; <br /> <br />, <br /> <br />M <br /> <br />L <br /> <br />Figure 1. Trail Plan <br /> <br />Area B: Pedestrian Bridl!e at 3SE <br />Area B was chosen for a pedestrian bridge to cross 35E because there are plans in Hugo to provide a trail along <br />Clearwater Creek and because it would more easily accommodate pedestrian traffic than at the automobile <br />intensive freeway interchange at 35E and County Road 14 (Frenchman Road). The urgency here is to control <br />develooment in the surrounding area on both sides of the freewav now to orovide a route for the oedestrian bridge. <br />At the meetinll. everYone thoul!bt this appears feasible. A small section of land westof35E to 20th Ave needs to be <br />coordinated by Lino Lakes, Centerville, and Anoka County. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.