My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-25 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-02-25 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2009 3:59:05 PM
Creation date
2/20/2009 3:58:12 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />mCONSULTING <br /> <br />.GROUP, <br /> <br />I NC. <br /> <br />LETTER OF TRANSMITTAL <br /> <br />Tr~n!<p()TI4tion' Civil. Structural. F.nvir(lnml!nlal . Plllnning. Trllffi,. Lillldsc.:lpe Archit('cture. ParkinG <br /> <br />One Carlson Parkway North, Suite 150, Minneapolis. MN 55447.4443 (763) 475-0010 <br />http://www.srfconsulting.com Fax (763) 475-2429 <br /> <br />TO Ci of Centerville <br />1880 Main Street <br />Centerville, MN 55038-9131 <br /> <br /> <br />DATE: 2/4/2009 SRF NO. 650910230/66 <br />ATTENTION: Paul Palzer <br />Director of Public Works <br />SUBJECT: <br />Intersection Control Evaluation Report <br />for the CSAH 14/1-35 Interchange <br />Reconstruction Pro'ect (S.P. 02-614-28 <br /> <br />WE ARE SENDING YOU VIA: <br />Shop Drawing <br />Copy of Letter <br /> <br />X Mail <br />Prints <br />Change Order <br /> <br />Courier Overnight Mail <br />Plans <br />Specifications <br /> <br />Other <br />X Report <br />Other <br /> <br />COPIES <br />5 <br /> <br />DESCRIPTION <br /> <br />Signed Original Intersection Control Evaluation Reports - for signature and approval <br /> <br />-RANSMITTED AS CHECKED BELOW <br /> <br />X F or Approval <br />As Requested <br /> <br />For Your Use <br />For Review and Comment <br /> <br />Return for Corrections <br />Other <br /> <br />REMARKS <br />Mr. Palzer: <br />Enclosed are five copies of the Intersection Control Evaluation reports for the CSAH 14/1-35E <br />Interchange reconstruction project. This report Is in a format that has been deemed acceptable by <br />Anoka County and Mn/DOT. Please sign these five reports and return them to me in order to foster <br />timely approval of this project. Once all agency signatures have been obtained, I will make sure that <br />you receive a copy of this report for your records. <br /> <br />Feel free to call me (763.475.0010) or email me(apotter@srfconsulting.com) with any questions <br /> <br />or concerns. Thanksl <br /> <br />CC: Kevin Jullie, SRF Consulting Group, Inc. <br /> <br />With Attachment <br /> <br />X Without Attachment . /1 <br /> <br />Adrian S. Potter ~ J ~ <br /> <br />SIGNED: <br /> <br />"enc1t?sures are not as noted, kindly notify us at once <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.