My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-18 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2009
>
2009-03-18 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2009 1:28:25 PM
Creation date
3/13/2009 3:48:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roadway Treatments <br />No roadway treatments are planned as part of this project. <br /> <br />Structures <br />A pedestrian bridge structure will be used to cross Clearwater Creek along <br />segment L. The structure will be a prefabricated single span steel truss bridge. <br /> <br />X. TRAFFIC DURING CONSTRUCTION <br />The project will be constructed within the boulevard along sections of <br />Centerville Road (CSAH 21), Main Street (CSAH 14) and 20th Avenue (CSAH 54). <br />Minor temporary traffic control may be necessary at some intersections to <br />install pedestrian ramps along the curb and allow work within medians. Traffic <br />control will follow the Minnesota Manual on Uniform Traffic Control Devices <br />(MMUTCD). <br />
The URL can be used to link to this page
Your browser does not support the video tag.