Laserfiche WebLink
<br />Roadway Treatments <br />No roadway treatments are planned as part of this project. <br /> <br />Structures <br />A pedestrian bridge structure will be used to cross Clearwater Creek along <br />segment L. The structure will be a prefabricated single span steel truss bridge. <br /> <br />X. TRAFFIC DURING CONSTRUCTION <br />The project will be constructed within the boulevard along sections of <br />Centerville Road (CSAH 21), Main Street (CSAH 14) and 20th Avenue (CSAH 54). <br />Minor temporary traffic control may be necessary at some intersections to <br />install pedestrian ramps along the curb and allow work within medians. Traffic <br />control will follow the Minnesota Manual on Uniform Traffic Control Devices <br />(MMUTCD). <br />