My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-18 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2009
>
2009-03-18 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2009 1:28:25 PM
Creation date
3/13/2009 3:48:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Project Requirements Document (PRO) <br /> <br />7) The arbor slats shall be made of 2 x 6 cedar. <br /> <br />8) The surface under the arbor shall match the surface chosen for the hard surfaces of the <br />park. <br /> <br />9) The surface of the park shall be a colored stamped concrete. <br /> <br />10) The arbor shall have 2 benches of the same design as the other benches in the new <br />park. <br /> <br />2009 Park Addition - Arbor <br /> <br />Page 2 of2 <br /> <br />03/18/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.