Laserfiche WebLink
<br />Centerville Park Improvements <br /> <br />Preliminary Cost Estimate <br />311612009,411109 <br /> <br />EsnMATED EST1MAno Alternates <br />DESCRIPTlON TOTAL EST. TOTAL UNIT TOTAL <br />NO. UNIT QUANTTTY COST COST <br /> <br /> Main Park <br /> Proposed Walks: Colored Concrete or Pavers SF 2330 $500 $11.650.00 <br /> Altemate: pervious pavers with granular base SF $1000 <br /> Deciduous Trees (2. ca. B&8) wI additionallopsoil and excavation EA 17 547500 $8.075.00 <br /> Perennials (flats. 18" oc) EA 470 59.00 54.23000 <br /> Ornamental Grass (1Iats. 18' oc) EA 470 $900 54.230.00 <br /> Deciduous ShrubS (as shown on plan) EA 30 $35.00 $1.05000 <br /> Freedom Turf Mix (seed) SV 500 $1.25 $62500 <br /> landscape Edger LF 375 $2.75 $1,031.25 <br /> Topsod (6" depth lor Freedom Turf areas) CV 83 58.00 $66400 <br /> Select Topsoil Borrow (8-10' depth lor plant bed areas) CV 60 $14.00 5840.00 <br /> Irrigation SF 6700 $065 $4,35500 <br /> Irrigation Cabinet and controls LS 1 $2,500.00 $2,500 00 <br /> Pedestrian Lights (includes footings) EA 0 $6.25000 $0.00 <br />1 Fountain Mechanicallmatenals & InstallatiOn) LS 1 $20.00000 $20,000 00 <br />1 Centerpiece and pool LS 1 545,00000 $45.000.00 <br />2 KoskJTrail Head Structure: ( Interpretive GraphiCS & maps not included) EA 0 $tO,OOO,oo $0.00 <br />3 Drinking Fountain: incl.2 curb stops, 10 ft.. cop.pipe, 1 c. stop EA 1 SS,150,00 $5,15000 <br />4 Benches EA 4 $1,600.00 $6,40000 <br />5 Arbor/Pergola Structure LF 0 $25.000.00 $000 <br />5 Structure Lighting LS 1 $2,250,00 52.250 00 <br /> Waste receptacles EA 1 $1,30000 $1.300.00 <br /> Peace Pole: Sandblasted Cedar in 4 Lanquages EA 1 $1.000.00 $1.000.00 <br /> Park Sub Total Cost $108,700.25 <br /> North Park <br /> Bituminous Path' InCludes grading. base prep. paving. repair SV 0 $2800 $0.00 <br /> Stone Curbing LF 78 $500 $390 00 <br /> Concrete Overlook./bench pad: Ilncludes grading. base. & repair SF 160 $500 $60000 <br /> Deciduous Trees (2' ca, B&B) wI additlonallopsoil and excavation EA 6 $475.00 $2.850.00 <br /> Perennials (flats. 18' ee) EA 16 $9.00 $144.00 <br /> Omamental Grass (flats. 18' OC) EA 16 $900 $14400 <br /> Deciduous Shrubs (as shown on plan) EA 15 $3500 $525.00 <br /> Freedom Turf Mix (seed) SV 90 $1.25 $112.50 <br /> Landscape Edger LF 100 $2.75 $275.00 <br /> Topsoil i6' depth for Freedom Turf areas} CV 2 $800 $12.80 <br /> Irrigation SF 800 $0.65 $520.00 <br /> Imgatlon CaOlnet ana contrOls LS 0 $2.500 00 $0.00 <br /> Pedestrian Lights (includes lootlngS). OIy.3 EA 56.250.00 $0.00 <br /> Lighting Infrastructure (winng, sleevlng, handholes) LS 0 54.00000 $0.00 <br /> Benches EA 2 S 1,600,00 $3,200.00 <br /> Fishing Pier SF 0 $35.00 $000 <br /> North Sub Total Cost $8,973,30 <br /> <br />$10.000.00 <br /> <br />$25.000.00 <br /> <br />$18,750 <br />54.00000 <br />