Laserfiche WebLink
<br /> <br />City of Centerville <br />F.""" .rL....,~ <br /> <br />Project Requirements Document (PRO) <br /> <br />Project Name: 2009 Hidden SprinQ Park SiQnaQe Proiect <br /> <br />Document Creation/Revision Date: 03/10/09 <br /> <br />DRAFT 1.0 <br /> <br />Prepared by: Citv of Centerville Parks & Recreation Committee <br /> <br />P & R Project Contact: Kevin Amundsen (H) 651.653.1147 <br /> <br />Work to be perfonned or overseen by: Centerville Public Works Department <br /> <br />Expected Project Completion Date: To be advised <br /> <br />Project Description: <br /> <br />This project is to order and install signage to Hidden Spring Park. 'No Trespassing' signs on <br />south property line and 'No Swimming...' signs on shoreline. Signage to be ordered by City <br />Staff from the M&R Sign Company's catalog supplied to P&R by City Staff. <br /> <br />Document Scope: <br /> <br />This document represents best efforts of the Centerville Parks & Recreation Committee to list <br />the project requirements that are deemed necessary for a favorable outcome to the project. <br />Local regulations, safety considerations and best construction practices will take precedent over <br />these requirements; however it is the obligation of those who are overseeing the work <br />performed to bring such discrepancies to the attention of the P & R Project Contact for further <br />discussion. <br /> <br />Project Requirements: <br /> <br />1) Order three (3) "No Trespassing" Signs per (attached example #l.A), and three (3) metal <br />'U' Posts five (5) feet in length and green in color (if possible). <br /> <br />Clarification: Installation will be in the locations shown (attached example #2). Posts to <br />be driven eighteen (18) deep to reveal forty-two (42) inches of Post above ground to <br />attach Sign aligning with the top of post. Use .025 inch galvanized or stainless steel <br />nuts and bolts long enough to attach sign to post. <br /> <br />2) Order six (6) "No Trespassing" signs per (attached example #1.8) and three (3) wooden <br />green treated poles five (5) feet in length. <br /> <br />Clarification: Installation will be in the locations shown (attached example #2). Posts to <br />be sunk eighteen (18) deep to reveal forty-two (42) inches of pole above ground to <br />attach two (2) signs per pole at a forty-five (45) degree angle to trail, aligning each with <br /> <br />2009 Trail Bridge Project <br /> <br />Page 1 <br /> <br />04/01/2009 <br />