My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-01 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2009
>
2009-04-01 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2009 1:47:10 PM
Creation date
3/27/2009 1:02:47 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Subject: TE Grant Trail Project - Park's Meeting Meeting No: 1 <br />Project No: 000616-08165-0 Location: City Hall <br />Page: 2 of 2 Date: 3/18/09 <br /> <br />Item Description Action by <br /> The possibility of a trail connection at Goiffon Road and CSAH 14 (west of <br />8 proposed park) by the church was discussed. The committee was not confident City <br /> in obtainino the easement needed from the church to construct this trail. <br />9 All trails require 2' clear zone, with 3' clear from any sign, pole, tree, etc. <br />10 During the 2009 Fete de lacs Parade, coordination between the contractor for City/City Contractor <br />the 2009 Street Proiect and the Cilv will be needed durino the oarade line-uo. <br />11 Volunteers are needed for the Festival of lakes 8k Run on August 8". Bonestroo <br /> <br />Signed Chris long <br /> <br />_: IC.S.ISt.tU:Wl2"P..... _ """" ~lWl (~.docJVI.M021ll~ <br /> <br />Page 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.