Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1 . BASE QUOTATION. POND DREDGING: <br />1 MOBILIZATION LS 1 3500.00 0,5 0.5 $1.750.00 <br />2 TRAFFIC CONTROl LS 1 . 2500.00 0.5 0.5 $1,250,00 <br />3 POND EXCAVATION (P) - WINTER CY 227S 21.00 227 227 $4,767.00 <br />4 DITCH EXCAVATION - WINTER LF 825 18.00 $0.00 <br />5 TEMPORARY SEEDING. INCl. SEED MIXTURE BWSR W4 AND <br /> MULCH SY 950 2,00 .' $0,00 <br />6 FINAL SEEDING -INCl. SEED MIXTURE BWSR W4 AND.EIlOSION <br /> CONTROL BLANKET, CATEGORY 3 SY 1500 2.00 $0.00 <br /> TOTAL PART 1 - BASE QUOTATION - POND DREDGING: $7,767.00 <br /> CHANGE ORDER NO.1 <br /> DITCH EXCAVATION LF 150 18.00 150 150 $2,700.00 <br /> TOTAL CHANGE ORDER NO.1 $2,700.00 <br /> TOTAL PART 1 . BASE QUOTATION. POND DREDGING: $7,767.00 <br /> TOTAL CHANGE ORDER NO.1 $2,700.00 <br /> TOTAL WORK COMPLETED TO DATE $10,467.00 <br /> <br />81B09168REQ1.x1s <br />