My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-31 CC Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-03-31 CC Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2009 2:03:07 PM
Creation date
4/1/2009 8:19:09 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1 . BASE QUOTATION. POND DREDGING: <br />1 MOBILIZATION LS 1 3500.00 0,5 0.5 $1.750.00 <br />2 TRAFFIC CONTROl LS 1 . 2500.00 0.5 0.5 $1,250,00 <br />3 POND EXCAVATION (P) - WINTER CY 227S 21.00 227 227 $4,767.00 <br />4 DITCH EXCAVATION - WINTER LF 825 18.00 $0.00 <br />5 TEMPORARY SEEDING. INCl. SEED MIXTURE BWSR W4 AND <br /> MULCH SY 950 2,00 .' $0,00 <br />6 FINAL SEEDING -INCl. SEED MIXTURE BWSR W4 AND.EIlOSION <br /> CONTROL BLANKET, CATEGORY 3 SY 1500 2.00 $0.00 <br /> TOTAL PART 1 - BASE QUOTATION - POND DREDGING: $7,767.00 <br /> CHANGE ORDER NO.1 <br /> DITCH EXCAVATION LF 150 18.00 150 150 $2,700.00 <br /> TOTAL CHANGE ORDER NO.1 $2,700.00 <br /> TOTAL PART 1 . BASE QUOTATION. POND DREDGING: $7,767.00 <br /> TOTAL CHANGE ORDER NO.1 $2,700.00 <br /> TOTAL WORK COMPLETED TO DATE $10,467.00 <br /> <br />81B09168REQ1.x1s <br />
The URL can be used to link to this page
Your browser does not support the video tag.