Laserfiche WebLink
<br />ESTIMATED PROJECT COST <br /> <br />Estimated Construction Cost <br /> <br />Administration, Engineering. Fiscal <br />and Legal (30%) <br /> <br />ESTIMATED TOTAL PROJECT COST <br /> <br />$520,500 <br /> <br />156,200 <br /> <br />$676,700 <br />