My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2024
>
2009
>
2009-04-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2009 7:36:13 AM
Creation date
4/20/2009 7:34:49 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Cenferville <br />IE Trail Granf <br /> <br />Poge3 <br />4/15109 <br /> <br />fa <br />The fees for the work described above are outlined in the table below. The work will be billed on <br />an hourly basis with not-to-exceed limits as shown below. The limits include our billable <br />expenses. <br /> <br />Fee Summary <br />DIal ~J..."'~ Cu~ 'l"~.' <br /> Aldh...-I-"~"-n ~b"" tD~ <br />Preliminary SUrvey $19,200 $0 $19,200 <br />Project Mlmorandum $15,000 $0 $15,000 <br />Design/BIdding $109,000 $0 $109,000 <br />PennIls $18.000 $0. $l8,000 <br />Pqencf RevIew SUbmittals $9,300 $0 $9,300 <br />UnfInished Se9l!llll4 LTraU $0 $(1,100) $C1,11lO) <br />DesIgn {credit) <br />Unfinished Bridge Design and $0 $(2,800) $(2,800) <br />Hydraulic Modeling (credit) <br />Segment L iIlld 1(2 TraI DesIgn $0 $6,800 $6,800 <br />CUNert (BrIdge) Modlflc:atlon $0 $8,000 $8,000 <br />Design and Hydraulic Modeling <br />PermIt Olanges $0 $3,500 $3,500 <br />Easell1el ftsjRf:1'N Delerminallon $0 $9,200 $9,200 <br />Total $170,500 $23,600 $194,100 <br /> <br />The following is a break down of how the trail design fees and credits above were calculated: <br /> <br />Original Design/Bidding Costs Breakdown <br />Trail Design <br />Bridge Design <br />Park Design <br />Biddina <br />Total <br /> <br />segment L - 6.9% of total trail length <br />segment L - 20% unfinished design credit <br />segment K2 - 1.6% of total trail length <br /> <br />Bridge - 20% unfinished design credit <br /> <br />$80,000 <br />$14,000 <br />$10,000 <br />S5.000 <br />$109,000 <br /> <br />$80,000 x 6.9% = $5,520 <br />$5,520 x 20% = ($1,104) <br />$80,000 x 1.6% = $1,280 <br /> <br />$14,000 x 20% = $(2,800) <br /> <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.