Laserfiche WebLink
<br /> Contract Unit Quantity Amount <br />No, Item Unit Quantity Price to Date to Date <br />58 15" RCP flared end section EA 3 360.00 3 $1,080.00 <br />59 15" HDPE flared end section with trash guard EA 1 265.00 1 $265.00 <br />60 12" HDPE flared end section EA 2 160.00 2 $320.00 <br />61 Class III random riprap CY 115 60.00 60 $3,600.00 <br />62 Improved pipe foundation LF 700 1.90 $0.00 <br />63 Seeding AC 0.5 1300.00 $0.00 <br />64 Silt fence, regular LF 300 5.00 $0.00 <br />65 Hay bales LF 200 7.00 $0.00 <br />66 Protection of catch basin in street EA 12 50.00 $0.00 <br />67 Ditch excavation LF 300 4.00 $0.00 <br /> Total Part 4 - Storm Sewer $66,450.45 <br /> Part 5 - Street <br />68 Mill bituminous pavement l' wide LF 100 4.70 $0.00 <br />69 Subgrade preparation SY 9100 1.00 1733 $1,733.00 <br />70 Geotextile fabric, Type V SY 9100 1.75 1733 $3,032.75 <br />71 Select 9ranular borrow (CV) CY 5500 5.50 963 $5,296.50 <br />72 Aggregate b~se, Class 5 TN 3100 12.00 $0.00 <br />73 Type 31 bituminous base course TN 870 30.70 $0.00 <br />74 Bituminous wear course, Type 41 (2002) TN 690 34.95 $0,00 <br />75 Bituminous material for tack coat GAL 400 1.60 $0.00 <br />76 Surmountable concrete curb and gutter LF 4200 7.40 $0.00 <br />77 Water for dust control 1000 GAL 100 20.00 $0.00 <br />78 4" Perforated polyethylene pipe LF 4200 4.85 800 $3,880.00 <br />79 Type III barricade EA 6 150.00 $0.00 <br />80 Skidsteer (bobcat) with operator HR 10 75.00 $0.00 <br />81 Street sweeper w/pick up broom & operator HR 10 100.00 $0.00 <br />82 Seeding AC 1.5 1300.00 $0.00 <br />83 4" concrete sidewalk SY 8000 2.35 $0.00 <br />84 Aggregate base, Class 5 - trail TN 250 12,00 $0.00 <br />85 Bituminous wear course, Type 41 A, Pathway (2002) TN 75 51.50 $0.00 <br /> Total Part 5 - Street $13,942.25 <br /> <br />Total Part 1 ~ Sanitary Sewer <br />Total Part 2 ~ Water Main <br />Total Part 3 . Services <br />Total Part 4 - Storm Sewer <br />Total Part 5 - Street <br /> <br />,$191,671.75 <br />$137,300.50 <br />$44,448.00 <br />$66,450,45 <br />$13,942.25 <br /> <br />Total Work Completed To Date <br /> <br />$453,812.95 <br /> <br />RFP-st<..l1 <br />